This paper puts forward the transferring method by planimetric controlling when it can only be connected with one-shaft in blind-level of the mine and makes an accuracy analysis to the survey result.
提出就矿山盲中段在只有一井联系时的平面控制传递方法,并就实测成果做精度分析。
This paper puts forward the transferring method by planimetric controlling when it can only be connected with one-shaft in blind-level of the mine and makes an accuracy analysis to the survey result.
提出就矿山盲中段在只有一井联系时的平面控制传递方法,并就实测成果做精度分析。
应用推荐