From this new access plan graph, you can see the following.
在这张新访问计划图中,您可以看到以下内容。
From the access plan graph in Figure 6, you can see the following.
在图6中访问计划图中,您可以看到以下内容。
From the access plan graph in Figure 6, you can do some initial performance analysis.
在图6的访问计划图中,您可以做一些初始性能分析。
After you collect those statistics, you get the new access plan graph shown in Figure 10.
您收集了这些统计数据之后,会得到如图10所示的新访问计划图。
After creating the three new indexes, you get the new access plan graph shown in Figure 13.
创建三个新索引之后,您图13中的新访问计划图。
From the access plan graph, you can see what choices the optimizer has made regarding how the query will be processed and the rationale for those choices.
从这张访问计划图中,您可以看到优化器对如何处理查询作出何种选择以及理由。
It includes how to understand the problem query better by using the visual AIDS provided by query formatting, annotation, reports, and the access plan graph.
其中包含如何通过使用查询格式化、注释、报告和访问计划图来更好地理解问题查询。
There is an attribute RUNSTATS TIMESTAMP on the table or index node of the access plan graph that indicates the last time when the statistics were collected.
在访问计划图的表或索引节点上会有一个RUNSTATSTIMESTAMP属性,它表示收集统计数据的时间。
So far, you've seen how you can analyze and tune a problem query with the assistance of Optim query Tuner capabilities, such as query annotation, access plan graph, and so on.
到目前为止,您已经看到如何在OptimQueryTuner各项功能的帮助下分析和调优问题查询,这些功能包括查询注释、访问计划图等等。
As a simple example, the following graph (produced by db2exfmt) shows the access plan for an "Insert into Test1 values (?,?,...)".
作为一个简单的例子,下面的图由db 2 exfmt产生展示了“Insertinto test1 values?”语句的访问计划。
Train graph is the base of railway transportation management and the working plan of transportation department.
列车运行图是铁路列车运行组织的基础,是铁路运输部门的工作计划。
The passenger train graph is the comprehensive plan and the basis of train operation organization for railway passenger transport organization.
旅客列车运行图是铁路旅客运输组织的综合性计划和行车组织基础。
A new plan formalism method and a plan knowledge graph concept.
提出了一种新的规划表示方法及规划知识图的概念。
Because a concept of supporting degree is introduced into plan knowledge graph, the recognized plans are changed reasonably as new evidences collected.
由于在规划知识图中增加了支持程度的概念,使得规划的识别可以随着收集到的新证据而合理地加以改变。
The 'time scale network' was worked out by building the dual-code network plan into the time coordinate, which can make the network graph more readable.
将双代号网络计划放在时间坐标里,编制成“时标网络”,使网络图的识读变得容易。
But goal graph build basis on the theory classical graph plan. Therefore it can not deal with the "soft" constraint action and target.
但由于目标图的识别方法是在经典的图规划的理论基础上,因而它也不具备识别出灵活规划中具有“软”限制动作或目标的能力。
The services composition plan was transferred into an AOV graph equivalently, and then was transformed into a binary tree further.
首先将一个服务的组合方案等效成AOV图,并将其转换成二叉树,然后进行后续遍历并编码。
The extremely useful graph plan source code, hoped can to the friend which needs to carry on graph processing provide helps, Visual Basic, graph Drawing.
非常有用的图形绘制源码,希望能够对需要进行图形处理的朋友提供帮助。
This workshop aims to introduce the current progress of knowledge graph in both academia and industry, discuss the major research challenges, and design a future plan for knowledge graph research.
本研讨会旨在集中展示知识图谱的当前在学术界和工业界的进展,讨论现有主要问题,为下一步知识图谱方向的研究工作做好规划。
This study is based on smart planning and plan recognition theory, research tools are planning graph algorithm, using a database programming model to achieve the user plan recognition algorithm.
本文的研究基础是智能规划和规划识别理论,研究工具是规划图算法,采用有库规划模型实现用户规划识别算法。
A plan for designing and setting up a model of moving graph for the symmetrical three phase voltage is proposed, and it is developed and used in the microcomputer.
提出建立一个发生对称三相电压的动画模型,对其进行规划设计,并在微型计算机上开发实施。
Site plan, plan, elevation, section, model photo etc. Please mark the graph in Chinese.
可能的场地图、平面图、立面图、剖面图、效果图或模型照片等。
Site plan, plan, elevation, section, model photo etc. Please mark the graph in Chinese.
可能的场地图、平面图、立面图、剖面图、效果图或模型照片等。
应用推荐