The process to control plan development is ineffective.
控制计划开发过程缺乏有效性。
The description is required to establish the amount of petroleum in place, predict the amount that can be produced and plan development operations.
油藏描述要确定石油的地下储量,预测能开采出来的油量以及规划开发的措施。
Practical tips and techniques are offered on a range of topics, including data logger installation, monitoring plan development, safety, and data interpretation.
在一系列的主题中都提供了实用性的窍门和技术,包括数据记录器的安装,监测计划的开发,安全和数据阐释。
P-GQIMconsists of 5 parts: process modeling, GQIM plan development, data collection, metric and analysis, and process improvement.
GQIM度量模型包括以下几个组成部分:过程建模、定义GQIM、数据获取、度量分析和过程改进。
Plan development area 50 square kilometers, in area resident population 80,000 people.
规划开发面积50平方公里,区内常驻人口8万人。
Plan development area 50 square kilometers, in area resident population 80,000 people.
规划开发面积50平方公里,区内常驻人口8万人。
应用推荐