• Started from the analysis of connection form between prop end and pit on top beam and quantified calculation to analyze the cause of prop end deformation, points out the defect for design.

    分析立柱柱头顶梁柱窝结构形式入手,采取定量计算的方法分析引起桩头变形的原因,指出设计上存在的缺陷

    youdao

  • The output connection in transitional period was one of the key technical difficulties during the transition from open-pit to underground mining.

    过渡期产量衔接矿山露天地下开采关键技术难题之一

    youdao

  • The output connection in transitional period was one of the key technical difficulties during the transition from open-pit to underground mining.

    过渡期产量衔接矿山露天地下开采关键技术难题之一

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定