• During bank slope excavation in cofferdam in a harbor construction, the work had to be suspended due to water leakage (river water and ground water) into the foundation pit.

    码头工程采用围堰进行岸坡开挖过程中受江水地下水位影响,基坑内有渗入导致工程无法进行。

    youdao

  • CAD is employed in the designing of pit heat-treatment furnace, containing a established data bank of furnace body, optimum seeking of furnace lining materials and automatic drawing-making.

    采用微机辅助设计热处理井式加热炉建立一套护设计数据库优选炉衬材料自动绘制炉体结构图。

    youdao

  • CAD is employed in the designing of pit heat-treatment furnace, containing a established data bank of furnace body, optimum seeking of furnace lining materials and automatic drawing-making.

    采用微机辅助设计热处理井式加热炉建立一套护设计数据库优选炉衬材料自动绘制炉体结构图。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定