• Considering the obvious decrease of the pit bottom bounce capacity and differential settlement, the inverted construction method is widely used.

    考虑到施工过程中对基坑底部回弹量和差异沉降量的明显减小,逆作法目前取得了较广泛的应用。

    youdao

  • When confined aquifer under the bottom of the pit, the foundation excavation will reduce the thickness of overlying impermeable layer.

    在基坑底部以下存在承压水层的情况下,基坑开挖减少含水层上覆不透水层的厚度。

    youdao

  • At the pitting station, knives entering the fruit from both top and bottom rotate, separating the pit from the flesh.

    在去核工段,切刀同时从顶部和底部旋转切入,将核与果肉分离。

    youdao

  • The paper provides the key factors to control the pit construction by restricting heave of the bottom soil and minimizing tunnel displacement.

    文章阐述了如何通过控制基坑施工主要影响参数,进而限制坑底土体隆起,减小隧道位移。

    youdao

  • When the length of the pile under the bottom of the pit is the same, the deeper the excavation is, the larger the ultimate uplift capacity of pile is.

    坑底以下有效桩长相同时,开挖深度越大,开挖后桩周土体超固结比越大,抗拔桩极限承载力也越大。

    youdao

  • Piles under the bottom of a pit are always subject to deflection due to excavation-induced soil movement on soft foundation.

    软弱地基开挖,流动土体对坑内桩基推挤,导致桩基偏位;

    youdao

  • By reducing the permeability of soil at the bottom of pit and selecting optimal dewatering depth, the settlement of ground surface can be well controlled.

    采用降低坑底土层渗透性的措施和选择最佳的降水深度能有效地控制坑外地表的沉降。

    youdao

  • By reducing the permeability of soil at the bottom of pit and selecting optimal dewatering depth, the settlement of ground surface can be well controlled.

    采用降低坑底土层渗透性的措施和选择最佳的降水深度能有效地控制坑外地表的沉降。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定