Project and system situation in Zouxian Power Plant were introduced, and the piping design parameters and the piping material of main steam system and main feed water system were determined.
对邹县发电厂四期工程和系统状况进行了介绍,确定了主蒸汽系统和主给水系统管道的设计参数,选择了管道材料。
The allowable stress of the pipe material shall be chosen from the data of GB 50316 Design Specification for Industrial Metal Piping.
管子材料的许用应力可按GB 50316《工业金属管道设计规范》中的数据选用。
Experience of plot plan, equipment layout, piping routine study, piping plan, isometrics, piping material take off and pipe support design against project standards & specification.
具备如下管道专业设计能力:装置布置图、设备布置、管线布置、单线图、管道材料表和管道支撑等设计能力;
Experience in equipment layout, piping routine study, piping layout, isometrics, piping material take off and pipe support design.
拥有在总体布置、管道走向、管道布置图、ISO图、材料表和管道支撑的设计经验;
Experience in equipment layout, piping routine study, piping layout, isometrics, piping material take off and pipe support design.
拥有在总体布置、管道走向、管道布置图、ISO图、材料表和管道支撑的设计经验;