• R409 + pipeline trench through the roof and installation of roof rain.

    R 409 +管道穿屋面地沟顶板装置

    youdao

  • How to make the backfilled soil of pipeline trench stabilized in an effective manner is a major concern for the normal operation of pipeline.

    如何采取有效手段保持管沟回填涉及管道正常运营问题

    youdao

  • Beijing Fuxing the pipeline Equipment co., Ltd. is a professional production and sale of the pipe trench integrated companies.

    北京福星管道设备有限公司一家专业生产销售沟槽管件综合性公司。

    youdao

  • West Pipeline crossing Heihe River is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench.

    黑河西部管道工程采用开挖方式穿越距离最长河流,原油成品油管道采用同敷设方式穿越河流。

    youdao

  • Once ready, the pipeline is carefully placed in the pre-dug trench or bored under waterways or roads.

    一旦准备好管道放入事先开挖好的沟槽穿越排水沟道路

    youdao

  • Once ready, the pipeline is carefully placed in the pre-dug trench or bored under waterways or roads.

    一旦准备好管道放入事先开挖好的沟槽穿越排水沟道路

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定