The results can be used as the reference in reliability analysis and designing of the combined arched pipeline bridge.
其结果可作为组合拱式管桥可靠性分析与设计的参考。
The linear and the nonlinear seismic response analyses of long-span cable-stayed pipeline bridge are discussed with this method.
利用该方法对大跨度斜拉管线桥进行了线性和非线性地震响应分析。
The pipeline bridge is built up with triangle sections, its shear stiffness can be derived from the stress diagram for the truss with triangle section.
在管道跨越工程中,常用三角形截面组合管拱,由三角形截面桁梁的受力分析图,分析推导出其抗剪刚度。
According to the actual structure characteristics of a cable-stayed pipeline bridge, a three dimensional finite element mathematical model is developed.
根据斜拉索管桥的实际结构特点,建立了三维有限元计算模型。
With its beautiful appearance, long span, good economic indicators, the advantages of mature design and construction, suspension bridge has been widely adopted for oil and gas pipeline bridge.
悬索桥结构以其外形美观、跨越能力强、经济指标良好和设计施工成熟等优点,在国内外油气管道桥建设中被大量采用。
The platforms are linked by a bridge which doubles as a pipeline for the removed CO2.
两个平台之间由一个桥连接着,它是输送被移除的二氧化碳的管道。
The swift start on the Xiangshan Island Bridge project reflects years of preparatory work, a top-down administration that tolerates little dissent and a pipeline of projects.
象山港大桥的迅速开工反映了这么多年周到的准备工作,至上而下异议不多的行政管理,以及大量的项目资源。
This paper has expounded the method and characteristics for laying city communication pipeline by the technique of steel truss, which is along the built bridge and striding over river.
本文阐述了采用钢桁架技术解决城市通信管道沿已建桥敷设跨河的方法和特点。
This is the Zhongyuan Oilfield in recent years, the maximum span of the construction of gas pipeline project, a pipeline project, but also that the first swing truss bridge tower.
这是中原油田近年来承建输气管道工程跨径最大的一项管道铺设项目,同时也是国内第一个摇摆塔式桁架桥。
The reason why gray castiron bridge pipeline with ammonia seal was quickly corroded was discussed and the countermeasure was suggested.
探讨了焦炉氨水自封槽结构灰铸铁桥管快速腐蚀的原因,提出了相应的处理对策。
The Xuyi Huaihe River bridge is a bridge combined with pipeline and road in Lu-Ning Oil pipeline.
鲁宁管线上的盱眙淮河大桥是管桥结合的一座桥。
In this paper, a finite element model for the analysis of the pipeline suspension bridge was set up with considering the initial internal force and verticality of the staying cable.
本文建立了悬索管桥分析的有限元模型,并考虑了悬索管桥恒载产生的初始内力、拉索垂度等几何非线性因素。
Compared with ordinary suspension bridge, pipeline suspension bridge's stiffness is smaller, wind-induced vibration problem is more prominent.
与普通悬索桥相比,管道悬索桥刚度更小、风振问题更突出。
It has been proved that the strength of pipeline arch bridge is absolutely controlled by the horizontal wind load.
实践证明,水平风荷载绝对控制拱式管桥的强度。
It has been proved that the strength of pipeline arch bridge is absolutely controlled by the horizontal wind load.
实践证明,水平风荷载绝对控制拱式管桥的强度。
应用推荐