• This final operation is the"pullback"and installs the line pipe under the river.

    最后操作叫“拖”,它使管道就位于河床下面

    youdao

  • When the pump sets lose electricity during operation, for the sake of preventing pipe failure by negative pressure, installed a surge shaft at the head of the pipe line.

    运行防止负压管道破坏管道首都设置调压井

    youdao

  • The normal operation of the high silt content water irrigation with pipe line is guaranteed by adopting the combinative technical measures of broke...

    同时结合防爆破技术措施管理措施,确保管道灌溉正常运行

    youdao

  • The normal operation of the high silt content water irrigation with pipe line is guaranteed by adopting the combinative technical measures of broken cont…

    同时结合防爆破技术措施管理措施,确保管道灌溉正常运行

    youdao

  • The normal operation of the high silt content water irrigation with pipe line is guaranteed by adopting the combinative technical measures of broken control an...

    同时结合防爆破技术措施管理措施,确保管道灌溉正常运行

    youdao

  • The normal operation of the high silt content water irrigation with pipe line is guaranteed by adopting the combinative technical measures of broken control an...

    同时结合防爆破技术措施管理措施,确保管道灌溉正常运行

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定