• The exit of Jia Zhu Qing tunnel in Nanning-Kunming Railway lies to Fang Ma Ping section where both debris flow and siltation are potential hazards affecting long-term safety of the rail way.

    南昆铁路竹菁隧道出口至放马坪垭口沿家河下游盲谷一段线路,存在泥石流及河床大潜灾。

    youdao

  • The exit of Jia Zhu Qing tunnel in Nanning-Kunming Railway lies to Fang Ma Ping section where both debris flow and siltation are potential hazards affecting long-term safety of the rail way.

    南昆铁路竹菁隧道出口至放马坪垭口沿家河下游盲谷一段线路,存在泥石流及河床大潜灾。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定