• Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.

    采用无底柱分段崩落采矿国内外一直采用截止品位控制出矿。

    youdao

  • Because of anciently usually adopting empirical method to determine the structure parameter of non pillar sublevel caving, there are hard to guarantee parameter optimize.

    由于底柱分段崩落法结构参数一直采用经验方法确定很难保证结构参数最佳,本文分析了放出体和矿石堆体的形态及其影响因素。

    youdao

  • Deficient floor slope Angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.

    采用沿脉布置无底柱分段崩落法,矿体底板倾角不足时,需要下盘岩石开掘进路

    youdao

  • The article analyzes how the hanging arch is caused during non-pillar sublevel caving in Jingtieshan mine, in order to provide a reference for rational mining organization and resources utilization.

    本文着重分析了镜铁山矿无底柱崩落法悬顶问题,合理安排矿山生产,合理利用矿产资源,提供了参考依据。

    youdao

  • The paper is of important instructive importance to reduce loss and depletion by sublevel caving method without sill pillar.

    今后无底柱分段崩落降低损失贫化具有重要指导意义。

    youdao

  • Sublevel caving method without sill pillar is adopted in the south section of Fengshan Copper Mine.

    丰山铜矿南缘采区应用分段崩落采矿。

    youdao

  • Disadvantages of sublevel caving without sill pillar lie in high ore loss and dilution as well as difficult control of ore loss and dilution.

    柱分段崩落采矿法存在损失贫化大和损失贫化难以控制缺点

    youdao

  • Sublevel caving without bottom pillar is the method of mining used at Huashugou Mine, Jiuchun Iron and Steel Co.

    酒泉钢铁公司桦树沟铁矿所用采矿方法分段崩落采矿方法。

    youdao

  • Sublevel caving without sill pillar is used in Xishimen Iron Mine.

    西石门铁矿采用底柱分段崩落采矿法开采。

    youdao

  • Sublevel caving without sill pillar is used in Xishimen Iron Mine.

    西石门铁矿采用底柱分段崩落采矿法开采。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定