This paper introduced a new method for it, ie continuous stoping of room and pillar in stages and to fill mined bed with falling roof by deep-hole blasting.
本文提出了一种矿房矿柱阶段性连续回采,深孔放顶处理空区的采矿方法。
This paper introduced a new method for it, ie continuous stoping of room and pillar in stages and to fill mined bed with falling roof by deep-hole blasting.
本文提出了一种矿房矿柱阶段性连续回采,深孔放顶处理空区的采矿方法。
应用推荐