• The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.

    采场的顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕后,一次性进行回收。

    youdao

  • Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.

    采用无底柱分段崩落采矿法,国内外一直采用截止品位放矿法来控制出矿。

    youdao

  • Population and application of the dilution ratio ore drawing method has certain social value and economic value for implementation of the sill pillar-free subdrifting method.

    低贫化放矿的推广应用对于实行无底分段崩落法的矿山具有一定的社会价值和经济价值。

    youdao

  • Population and application of the dilution ratio ore drawing method has certain social value and economic value for implementation of the sill pillar-free subdrifting method.

    低贫化放矿的推广应用对于实行无底分段崩落法的矿山具有一定的社会价值和经济价值。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定