Here the function mechanism and the technology process of grouting after pile driving technology are explained by engineering examples and the development prospect is pointed out.
本文通过工程实例阐述了桩底注浆的工作原理和工艺流程,指出了桩底注浆技术的发展前景。
The problem of the soil consolidation after tube-pile driving was studied.
研究了黏弹性土中管桩沉桩后的固结问题。
Using the theory of hydraulic fracture, radial and vertical distributions of excess pore water pressure are subsequently studied along the pile surface during and after pile driving.
运用水力压裂理论推导出沉桩产生的超孔隙水压力在沉桩后瞬时沿桩身径向和竖向的分布。
This paper aims at the improvement of the capacity of saturated sandy loam against liquefaction without drain after pile-driving.
本文目的是探索饱和亚砂土层在不排水条件下,沉桩后,抗液化能力的改善效果。
Based on the driving records, the back-figured method is applied to estimate the pile bearing capacity after refusal taking place.
结合一维应力波动理论,以实测打桩记录为依据,采用反分析方法确定当后继打桩出现拒锤现象时的单桩承载力。
Based on the driving records, the back-figured method is applied to estimate the pile bearing capacity after refusal taking place.
结合一维应力波动理论,以实测打桩记录为依据,采用反分析方法确定当后继打桩出现拒锤现象时的单桩承载力。
应用推荐