• The piezometric head is also measured from the same datum level.

    压水头应从同一基准面算起。

    youdao

  • The saturation line monitoring, which is done by manual usually with piezometric tube, is the main investigation item in tailings dam.

    浸润线尾矿主要监测项目一般采用测压管进行人工监测。

    youdao

  • Chooses of the customers are diversified, we can process high-pressure assembly, piezometric hose, PTFE hose, ultra-high pressure hose assembly, etc.

    公司不仅可以加工高压液压软管总成,还可以加工测压软管、铁氟龙软管、超高压软管总成等,为广大客户提供了多样化选择

    youdao

  • The law of observed water level change in piezometric tube is analyzed in this paper. Furthermore, the stability of soil core wall dam on the unsteady seepage is studied.

    分析了刘家峡黄土测压管实测水位变化规律研究了黄土心墙坝非恒定渗流下稳定性

    youdao

  • Meanwhile, in the case of the change of foundation thickness, the law of seepage amount, sand ring diameter, piezometric head, piping breach time etc were respectively explored.

    同时坝基厚度改变情况下,分别探索了流量、直径测压管水头、管涌破坏时间变化规律

    youdao

  • In view of complex nonlinear relationship between dam seepage parameters and piezometric tube level, the least squares support vector machine is applied to the back analysis of seepage parameters.

    针对石坝渗透参数测压管水位复杂非线性关系,应用最小二乘支持向量于土石坝渗透系数的反演。

    youdao

  • In view of complex nonlinear relationship between dam seepage parameters and piezometric tube level, the least squares support vector machine is applied to the back analysis of seepage parameters.

    针对石坝渗透参数测压管水位复杂非线性关系,应用最小二乘支持向量于土石坝渗透系数的反演。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定