PHC pipe pile plank in end is usually produced by cutting steel plank or forging, and then machining.
PH C管桩端板的通常生产方法是采用钢板切割或锻打成型,然后机加工而成。
Following the wide application of PHC Piles in construction of port, some weaknesses of the pile are also exposed.
随着PH C管桩在港口工程中的广泛应用,也逐渐暴露出该桩型的一些弱点。
The conclusions are useful for the further using of PHC pile as resistant extraction pile in engineering.
所得结论将为PHC管桩作为抗拔桩在工程中的应用提供有益的参考依据。
The behavior of PHC pipe piles under lateral load is lack of research now.
不同浅层地基处理法下PHC管桩水平承载性状对比尚缺乏研究。
Seismic design for PHC pipe piles in coastal liquefaction soft sub-soil was discussed.
探讨了沿海软土液化地基PHC管桩的抗震设计。
Combining with some seismic damage examples and according to the principles of seismic design of pile foundation, the behavior of PHC pipe piles under earthquake action was analyzed.
结合桩基工程震害实例,依据桩基抗震设计原则,研究PHC管桩受地震作用的表现性状。
Combining with some seismic damage examples and according to the principles of seismic design of pile foundation, the behavior of PHC pipe piles under earthquake action was analyzed.
结合桩基工程震害实例,依据桩基抗震设计原则,研究PHC管桩受地震作用的表现性状。