The application of large caisson in Nansha Port Area Phase I Project of Guangzhou Port and the construction technology are introduced.
介绍广州港南沙港区一期工程中所应用的大型沉箱及施工工艺。
The causes and treatment measures of concrete peeling of the approach embankment facing barrier board in Huanghua Port Phase I Project are introduced.
介绍黄骅港一期工程引堤护面栅栏板表皮混凝土脱落的原因和处理措施。
Combining the construction practice of Shantou port Guang ao Phase I Project, this paper introduces a new technology of transporting caissons by gas-bags.
结合汕头港广澳一期工程建设实例,介绍沉箱预制现场采用起重气囊出坑、搬运沉箱的一种新工艺。
In this article, I describe what occurs during the Inception phase of a DW project, and in Part 2, I describe the Elaboration, Construction, and Transition phases.
在本文中,我将介绍在DW项目的初始阶段中会发生什么,并且在第2部分中,我将介绍细化、构造,及移交阶段。
I then described the activities which occur during the RUP's Inception phase to get the project started and to address the scope risk associated with the effort.
然后,我介绍了发生于RUP初始阶段过程中的活动,以启动项目,并处理与工作相关的范围风险。
I coach teams to consider the Elaboration phase of a project as their "sandbox" time.
我指导团队将一个项目中的精化阶段看作“sandbox”时间。
To distinguish between project iteration milestones and phase-ends, I will introduce the concept of a "stage."
为了区分项目迭代里程碑和阶段末尾,我将介绍“阶段”这个的概念。
It briefly introduces the source of silt at the outer waterway of Shantou Port and construction situation and regulation effect of Phase I regulation project.
简要介绍汕头港外航道泥沙来源及一期整治工程的建设情况和整治效果。
Under the whole life cycle theory, I think I study the design phase and bidding phase of the two key nodes in the project cost control.
笔者在全寿命周期理论的视角下主要研究决策设计阶段和招投标阶段两个关键节点的工程造价控制。
Phase I of GreenGen project plans to capture a small amount of CO2 using post-combustion capture.
绿色煤电项目第一阶段计划捕捉少量燃烧后的二氧化氮。
Baishi Reservior, located on upstream of Daling River close to Sshangyuanxi Village in Beipiao, Liaoning, has been built as a key project in Phase I Development Plan in Daling drainage.
白石水库位于辽宁省北票市上园乡附近的大凌河干流上,是大凌河流域第一期开发的控制性骨干工程,水库建成后,将产生许多环境工程地质问题。
Taking the three-phase VSI as example, I give the detailed project by establishing the function definition the HM (Hardware Manager) and the am (Application Manager) and its implementation.
然后以三相电压源型逆变器作为例子,按照定义的硬件管理器和应用管理器的具体功能定义和实现给了详尽的方案。
Sino_Germany Cooperation Reforestation Project of Yunnan Province, China ( Phase I ) started in year 1995. The project covered 6 counties of 3 prefectures.
中德合作云南省I期造林项目于1995年启动,项目区包括滇东北3个地州市的6个县。
Zaohe pumping station, locating at the north Zaohe County, Suqian City of Jiangsu Province, is one of the sixth cascade pumping stations in South-to-North Water Transfer East Line Project, Phase I.
皂河泵站是南水北调东线第一期工程的第六梯级泵站之一,位于江苏省宿迁市皂河镇北。
The 5th chapter concerns about the new services provided by NGN intelligence reconstruction project phase I.
在第五章则简要介绍了NGN智能化改造项目第一期提供的业务。
The 5th chapter concerns about the new services provided by NGN intelligence reconstruction project phase I.
在第五章则简要介绍了NGN智能化改造项目第一期提供的业务。
应用推荐