• Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.

    采用多目标、多约束的优化方法,以悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型,并给出算例。

    youdao

  • This paper describes briefly the principle of the phase stability of temperature in coaxial cables and its relationship with the cable construction and materials.

    概述了同轴电缆的相位稳定性的原理,及其与电缆结构和材料的相互关系,也介绍了检测温度相位稳定性的试验方法。

    youdao

  • The conduction of special cable and special phase lock loop technology makes high signal more accurate;

    特种的传导电缆和特殊的锁相环技术使高度信号更精准;

    youdao

  • Optical fiber composition phase conductor (OPPC) is an optical cable with optical fiber unit in phase conductor.

    光纤复合相线(OPPC)是将光纤单元复合在相线中的光缆。

    youdao

  • For real cables in rain-wind weather, it is likely that water rivulet is non-uniform along cable axis and the phase lag between each part of rivulet movement will be incurred.

    实桥的斜拉索表面形成的水线位置沿索轴向有可能不均一,各部分水线的摆动可能存在位相差。

    youdao

  • Signal processing circuit and demodulation circuit with an automatic phase-locked junction can recover the data signal from the cable.

    解码电路对信号进行全面恢复处理,具有自动相位锁定功能。

    youdao

  • Instead of the time consuming numerical computation, a simplified calculation of the maximum field strength is presented for the purpose of dimensioning the three-phase gas insulated cable.

    为确定三相充气管道电缆的尺寸,本文提出利用最大场强的简化计算方法来取代繁复的数值计算。

    youdao

  • Simulation results show that it is necessary to consider capacitance current compensation in the phase-splitting current differential protection scheme for HTS power cable;

    结果表明,在高温超导电缆分相电流差动保护方案中必须考虑电容补偿;

    youdao

  • The first class cable – suitable for one single –phase earthing – block time does not exceed one minute each time. Max. time not exceed 8 hours , and not exceed 125 hours in all in one year.

    第一类——用于单相接地故障时间每一次一般不大于1min,亦可用于最长不超过8小时,每年累计不超过125小时的系统。

    youdao

  • The first class cable – suitable for one single –phase earthing – block time does not exceed one minute each time. Max. time not exceed 8 hours , and not exceed 125 hours in all in one year.

    第一类——用于单相接地故障时间每一次一般不大于1min,亦可用于最长不超过8小时,每年累计不超过125小时的系统。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定