• Overall responsible fall molding process documents maintain, PFMEA optimization.

    负责整个注塑制程的文件维护,过程FMEA的更新和优化。

    youdao

  • Are appropriate potential failure modes, as identified in the PFMEA, addressed through the control plan?

    所有在PFMEA中被识别的失效模式,是否在控制计划中都得到体现?

    youdao

  • Are potential failure modes, as identified in the PFMEA, addressed through error-proofing or the control plan?

    在PFMEA中所确定的潜在失效模式是否有防错措施或控制计划来处置?

    youdao

  • Design process flow diagram. Support PFMEA. Support process control plan. Take charge of operation instruction.

    负责工艺流程图编制,参与PFMEA、控制计划编制,负责操作指导书编制。

    youdao

  • Set up process document, and related engineering document like WI, PFMEA, PMP, Control Plan & Process Flow chart.

    设立工艺文件及相关的工程文件,如WI,PFMEA,PMP,控制计划及工艺流程图。

    youdao

  • Plan and update PFMEA based on real scrap rate before new project hand over to production department as GQS required.

    在新项目移交到生产部门前,按照GQS的要求,基于实际报废率计划及更新PFMEA;

    youdao

  • According a new product, technics, material and quality status, establish and/or revise PFMEA, control plan, SOP, and provide the training files for work station and workers.

    根据新产品、新工艺、新材料及质量状况等变化,建立或更新失效模式分析、控制计划、作业指导书等工艺文件,并培训宣贯至相应工位和人员。

    youdao

  • According a new product, technics, material and quality status, establish and/or revise PFMEA, control plan, SOP, and provide the training files for work station and workers.

    根据新产品、新工艺、新材料及质量状况等变化,建立或更新失效模式分析、控制计划、作业指导书等工艺文件,并培训宣贯至相应工位和人员。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定