• For a longer contract period project, the project benefit is affected by the price factor risk bigger, mastering the terms of the contract of the pricing formula is a useful tool to evade the risk.

    合同周期较长的项目,其项目效益受物价因素影响的风险更大,应用好合同条款中的调价公式是规避这一风险的有力工具。