• Complete these steps to create a new performance schedule.

    完成以下步骤,以创建一个新的性能计划。

    youdao

  • You will handle concurrency issues in the performance schedule instead of through the code.

    您将在这个执行调度中处理并发事件,而不需要通过代码。

    youdao

  • After a performance test or performance schedule has completed execution, the default Rational performance Tester report will be displayed to the user.

    在性能测试或者性能调度执行完毕后,RationalPerformance Tester会给用户生成一个缺省的报告。

    youdao

  • Enabling response time breakdown in a performance test will not affect the response time breakdown in any performance schedule that is referencing that test.

    在性能测试中激活响应时间分解不会影响任何性能调度中的响应时间分解。

    youdao

  • The reverse is true, too: Enabling response time breakdown in a performance schedule will not affect the response time breakdown configuration in a performance test.

    反之依然,在性能调度中激活响应时间分解也不会影响性能测试中的响应时间分解配置。

    youdao

  • Performance Tester has the ability to collect from ITM monitoring agents, in real-time, without having to configure a resource location through a performance schedule.

    在不用通过性能进度表配置资源位置的情况下,Performance Tester具有实时地从ITM监控代理那里收集数据的能力。

    youdao

  • The popularity of the Wucai Children's Chorus, a troupe from the vast Hulun Buir Prairie in the Inner Mongolia Autonomous Region, is easy to see from its performance schedule.

    来自内蒙古自治区呼伦贝尔大草原的五彩儿童合唱团之所以流行可以从它的表演计划表明显的看出来。

    youdao

  • Working with a modest budget, the strategy was to design a building that could be constructed in phases over three years to allow the College to maintain their summer performance schedule.

    由于预算有限,工程的建设工作被分为三个阶段以使学校可以维持他们夏季的表演进度。

    youdao

  • The Performance Schedule window will open (Figure 34).

    窗口将被打开,如图34中所示。

    youdao

  • In the Performance schedule wizard, enter the name of the schedule, and then click Finish, as shown in Figure 11.

    在Performance Schedule向导中,输入调度的名称,然后点击Finish按钮,如图11所示。

    youdao

  • In the Run configurations window, select Performance Schedule on the left, then click the new button to create a new configuration, as shown in Figure 16.

    在Runconfigurations窗口中,选择左边的Performance Schedule,然后点击New按钮创建一个新的设置,如图16所示。

    youdao

  • You can use the defaults for the rest of the wizard steps, Options, Performance, Schedule, and Summary, which I won't repeat as they are similar steps to offline restore.

    对于向导的其余步骤(选项、性能、调度和总结),可以使用默认设置;因为这些步骤与离线恢复相似,这里就不重复解释了。

    youdao

  • You can use the defaults for the rest of the wizard steps, Options, Performance, Schedule, and Summary, which I won't repeat as they are similar steps to offline restore.

    对于向导的其余步骤(选项、性能、调度和总结),可以使用默认设置;因为这些步骤与离线恢复相似,这里就不重复解释了。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定