It was found that as the magnitude of the low bid increased, the resulting completed project cost tended to increase absolutely and as a percentage of the original bid.
人们已经发现如果低出价的投标额增加,完工项目的成本绝对会随之而增加,并且与原有的出价之间存在相应的百分比关系。
It was found that as the magnitude of the low bid increased, the resulting completed project cost tended to increase absolutely and as a percentage of the original bid.
人们已经发现如果低出价的投标额增加,完工项目的成本绝对会随之而增加,并且与原有的出价之间存在相应的百分比关系。
应用推荐