It shows the enormous variability between "base load" and "peak load" among different energy users.
图中显示了不同用户在最低负荷和最高负荷之间的巨大变动。
However, there are peak load scenarios where ARFM cannot meet the service policy goals and avoid overloading the nodes.
然而,在一些出现峰值负载的场景中,ARFM无法满足服务策略目标以及避免节点超载。
During peak load times, more instances are added to the cluster and when the load comes down, the number of instances comes down.
在负载峰值期间,集群会增加更多的实例,而当负载下降时,实例的数量也会下降。
The main objective of smart power meters is to lower the peak load and thus enable utilities to keep down their peak generating capacity.
智能电表的主要目的是降低峰值负荷,从而使电厂能够降低峰值发电功率。
Another important factor to consider is the geographic distribution of the user community which will also impact the average and peak load of the system.
另一个需要被考虑的重要因素是,用户社区的地理分布,这也影响着系统的平均负载和最大负载。
So it is unsuitable to unload at about 95% of the peak load.
可以认为,用在95%最大荷载点卸载代替最大荷载点卸载是不妥的。
Do the number of staff working on the Service Desk change in times of peak load?
是否根据业务繁忙时间段来调整服务台值班人员的数量?
The calculated values with peak load formulae coincide well with the experimental ones.
用极限载荷公式得到的计算值与实验值符合良好。
The difference in the peak load on the upstroke and the minimum load on the downstroke of a polished rod.
光杆上行冲程时的最大负载与下行冲程时的最小负载之差。
Furthermore, there is the additional 40% more coal consumed in peak load regulation plus a shortened working life.
而且火电机组调峰煤耗还要增加40%,寿命也要缩短。
The features of power sources structure and present situation of peak load regulation in Fujian power grid are described.
分析了福建电网电源结构的特点和调峰现状。
Close is the correlation between frequency regulation, peak load and tie-line regulation in the interconnected power system.
互联电网的调峰调频问题与联络线调整密切相关。
It has been used to forecast the LMP at low load period, medium load period and peak load period in American PJM power market.
对美国PJM电力市场的峰荷时段、腰荷时段和低谷时段的LMP实时电价分别进行了预测。
After analyzing the collected data, it was found that the peak load was 2,129 concurrent users averaging 18.8 Requests per second.
分析完收集的数据后发现,峰值负载为2,129个并发用户每秒平均发出18.8个请求。
For peak load unit, its process model and structure parameters have obviously fast time-varying characteristic while load changing.
对于调峰机组,当负荷变化时机组的过程模型甚至结构参数都具有明显的快时变特性。
Change of power consumption structure requires most large-capacity units to be involved in peak load regulation of electricity grid.
用电结构的变化要求大容量机组普遍参与电网调峰。
The capacity of peak load unit directly affects peak electricity price level and reliability of power supply during peak load period.
峰荷机组装机容量的确定直接影响到峰荷时段的电价尖峰水平和供电可靠性等问题。
The simulation result shows that the model is fit for using IL in peak load congestion restricted dispatch in developing power market.
算例结果表明,该模型能够适应电力市场初期可中断负荷参与电网高峰期网络受阻约束调度的需要。
The stress relaxation experiments of rocks under the deformation at peak load and load-unload experiments before peak load are carried out.
进行了岩石在峰值荷载变形条件下的松弛试验及峰值荷载前的加卸载试验。
Presents respectively the theoretical calculating methods of peak load regulating in direct and indirect geothermal district heating systems.
介绍了直接式和间接式地热供热系统调峰负荷的理论计算方法。
In the distributed environment, CPU utilization must be balanced against expected peak load, hardware failure and defined Quality of Service requirements.
在分布式环境中,CPU的利用率必须在预期的最大负载、硬件故障和已定义的服务质量要求之间平衡。
MAIN OUTCOME MEASURES: the peak load and the power consumption were measured when the nerves ruptured and the nerve stress strain curve was described.
主要观察指标:测量神经断裂时的最大负荷、功耗,并描绘出神经应力—应变曲线。
This algorithm is applicable to designing and operational computation of medium and low pressure pipe network (actual pipe network peak load computation).
此算法可用于中压、低压管网设计型问题及操作型问题计算(实际管网最大负荷计算)。
In electrical power dispatch, the interruptible load participating in shifting peak load is propitious to optimize the configuration of power system resources.
电力生产调度中,可中断负荷参与调峰有利于电力系统资源的优化配置。
The results showed that the crack initiation Angle and the peak load increased as the distance of the preexisting crack from the midpoint of the beam increased.
结果表明,随着预制裂纹偏离梁中线距离的增加,裂纹的起裂角和峰值荷载都增大。
The power energy management system can reduce the consumption of the products effectively in order to realize the peak load shifting and production cost reducing.
利用电力能源管理系统可有效降低产品电能消耗,实现移峰填谷,降低生产成本。
The rule of peak load changing with weather is discussed based on dealing with historic load in order to forecast daily peak load and find reasonable numerical model.
针对夏季气象因素对日峰荷的影响,在总结常规负荷特性分析缺陷的基础上,提出用人体舒适度作为综合气象指标来反映其对日峰荷的影响。
After the improvement, the stable combustion test load without firing oil is as low as 45% of rated load, which greatly enhanced the ability of in depth peak load cycling.
改造后其不投油稳燃试验负荷达到了45%,大大提高了锅炉的深度调峰能力。
The base unit of measure for determining our expected load was "page views per second," which measures how many pages the portal server can serve for each second during peak load.
确定我们理想负载量的基本测量单位是“页面查看量/秒”,它测量在峰值负载时门户服务器每秒可以处理多少页面。
The base unit of measure for determining our expected load was "page views per second," which measures how many pages the portal server can serve for each second during peak load.
确定我们理想负载量的基本测量单位是“页面查看量/秒”,它测量在峰值负载时门户服务器每秒可以处理多少页面。
应用推荐