During the construction of Daxia Hydropower Station, the management pattern of construction management combined with production management was adopted.
大峡水电站建设实行建设管理和生产运行合一的管理模式,在建设的全过程进行“三控制、一协调”。
During the construction of Daxia Hydropower Station, the management pattern of construction management combined with production management was adopted.
大峡水电站建设实行建设管理和生产运行合一的管理模式,在建设的全过程进行“三控制、一协调”。
应用推荐