The alternative load path method is widely used to analyze the structural progressive collapse in civil engineering.
备用荷载路径法是结构连续性倒塌分析中最常用的方法。
Then, the source signals can be recovered by the shortest path method.
在估计出混合矩阵的基础上,利用最短路径法分离出源信号。
The optimization of ventilation network can be achieved by using path method.
优化通风网络可应用通路法。
Ultrasonic flaw location in semisphere butt welds by sound path method is described.
介绍半球对接焊缝超声探伤的声程定位方法。
According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
This proposed segmentation method behaves particularly good for poorly printed characters, and it can make a good supplement of the most often used shortest path method.
该方法对印刷质量较差的粘连字符效果更好,可以作为常用的最短路径法的一个很好的补充算法,以提高分割成功率。
Carrying out simulation of process by sequential modular approach, optimization of slight boost pressure process and boost pressure process have been realized by feasible path method.
以序贯模块法作为流程模拟方法,采用可行路径法对两种流程进行了优化。
With the method of differential optical absorption spectroscopy (DOAS), aerosol along the light path is monitored and its size distribution is measured with double optical path method.
介绍了利用双光路差分吸收光谱(DOAS)技术监测大气气溶胶并反演其粒谱分布的新方法。
More practical ray tracing methods currently include the wavefront method, the shortest path method, the travel time epenthesis method, the eikonal equation finite difference method, etc.
当前实用性较强的射线追踪方法,包括波前法,最短路径法,走时插值法,程函方程有限差分法等。
Three methods are discussed to solve the one pursue two problem, they are course method of the initial angular bisector, course method of the instantaneous angular bisector and mid-point path method.
解决一追二问题的方法共讨论了三种:初始角的平分线航向法、瞬时角的平分线航向法、中点轨迹法。
The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.
网络计划技术是一种制定计划和对项目进行管理的方法,最常用的即是关键线路法CPM和计划评审技术PERT。
This method of analysis is commonly known as the Critical Path method (CPM).
该分析方法通常被称为关键路线法(Critical Path Method (CPM))。
By elaborating the knowledge hierarchy of Project Management, and time Management theory, the article explains Critical Path method of managing time, and how to apply the method.
本文通过对项目管理知识体系和项目时间管理理论的阐述,详细介绍了时间管理中关键路径的理论和使用方法。
By elaborating the knowledge hierarchy of Project Management, and time Management theory, the article explains Critical Path method of managing time, and how to apply the method.
本文通过对项目管理知识体系和项目时间管理理论的阐述,详细介绍了时间管理中关键路径的理论和使用方法。