• The technology of variable frequency speed governing was used in the driving system of the experiment stand. And the advanced stepping digital overflow valve was adopted in the part of loading.

    试验台驱动系统采用交流变频调速技术加载部分采用先进步进式数字溢流进行加载。

    youdao

  • After loading, the language variants part of the classification taxonomy should be displayed, as shown in Figure 7.

    加载之后类别分类语言变体部分应该显示出来如图7所示。

    youdao

  • Upon loading of any WSDL, the registry creates a set of logical objects representing the different parts of the service definition, and the included policies are just another part of that.

    加载任何WSDL时注册中心创建表示服务定义不同部分逻辑对象并且所包括策略只是该服务定义的另一个部分

    youdao

  • If you put them inside the tag, no part of the page body will actually render until after the script has loaded and executed, giving the user the impression that your page is loading slowly.

    如果它们放在标记内部,只有脚本加载执行后页面主体才会呈现从而让用户觉得页面加载很慢

    youdao

  • Whether it's loading the dishwasher, sorting the laundry or feeding the dogs my son is now a part of it.

    无论是洗碗机衣服或是喂食儿子都会帮忙。

    youdao

  • It involves loading an initial ram disk (initrd) and then passing control to a program called init, a program that is usually installed as part of the sysvinit package.

    涉及到加载初始ram磁盘(initrd),然后控件传给名为init程序通常作为sysvinit一部分安装的一个程序。

    youdao

  • The RJCB runtime files are part of the so-called Common plug-in, which takes care of loading the runtime DLL and exporting the RJCB.jar file to all bridge plug-ins in Eclipse.

    RJCB运行文件所谓公共插件一部分负责加载运行时DLL,为Eclipse 中的所有插件导出RJCB.jar

    youdao

  • As part of the lazy loading strategy, when an organizational TreeItem widget is created, you don't have the data to create all of its child widgets.

    按照惰性装载策略,在创建组织TreeIte m部件没有创建所有子部件所需数据

    youdao

  • The pre-loading was incorporated as part of the load testing, which was set up to read a list of all of the HKEYs and log each user into the portal once.

    预装载被合并装载测试一部分设计用来一次读取保存所有HKEY列表每个用户记录门户

    youdao

  • The only tricky part is if you don't click the right area of the thumbnail, you'll get the full product page loading.

    唯一有些棘手如果点击右侧预览小图直接读取产品尺寸大图页面。

    youdao

  • It is part of the JarIndex implementation and used by class loaders to speed up the class loading process.

    JarIndex实现一部分,装载器用于加速类装载过程。

    youdao

  • Automotive half shaft flange is a coupling part under the combined action of bending and torsion, its strength, loading and actual size have an uncertainty.

    汽车凸缘受弯联合作用联接零件强度载荷实际尺寸具有不确定性

    youdao

  • Railway applications - Track - Test methods for fastening systems - Part 4: effect of repeated loading.

    铁路设施。轨道紧固系统试验方法第4部分重复荷载的影响

    youdao

  • As the key part of the beam-column connection in the structural steel frame, the connected capacities influence the integral responses of the whole frame on loading.

    结构建筑中,梁柱节点作为框架中的关键连接部分连接性能直接影响整个框架在荷载作用下整体反应

    youdao

  • Our products are used for a variety of manufacturing processes including: Assembly, Pick and Place, Packaging, Loading & Unloading, Part Transfer.

    我们产品范围包括装配挑选定位包装装卸部件传输等制造过程

    youdao

  • Provision for loading and unloading of raw materials for all dies, as well as part ejection and scrap removal will be covered during the die design.

    在扫数模具计划中,必须供给未加工已加工的工序图,以及产品顶出废料脱落方法。

    youdao

  • Aimed at complex geology condition and requirements of big and concentive loading structure on upper part for foundation, drilled cast piles foundation is selected through comprehensive analysis.

    针对复杂地质条件上部集中的荷载结构基础要求通过综合技术分析,选用了挖灌注桩基础。

    youdao

  • Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.

    介绍了采煤机大功率截加载试验一种新的实现方法同时阐述了加载试验的工作原理主要组成部分主要技术特点

    youdao

  • Aim to the problem of cutting part with shearer at the mechanical repair workshop, the loading test bed for shearer cutting part undergoing maintenance is manufactured.

    针对车间采煤机截加载问题研制开发面向维修的采煤机截部加载试验台,对维修后的采煤机截割部进行加载试验

    youdao

  • There iss strong vibration in the draft tube of a Francis turbine or axial flow fixed blade propeller hydraulic turbine when the turbine is running on part loading.

    水轮机部分负荷下运行,尾水管中常出现较为强烈振动

    youdao

  • Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.

    介绍采煤机牵引部直流电力回馈加载试验台的组成工作原理特点,加载方法控制,测试数据的采集、输出及显示。

    youdao

  • The rest of the time would be spent on waiting, moving, setting up, loading, unloading, inspecting the part, setting speeds and feeds, and changing cutting tools.

    其余时间完全等待, 运送,配置装卸检验调速改变电切工具上。

    youdao

  • Lastly, design the digital control part of the fin stabilizer relying on the actual demand of the system, and analyze the experimental data of static loading experiments.

    最后,结合实际系统要求设计减摇加载系统的数字控制部分静态加载实验所获得的数据进行了分析

    youdao

  • Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.

    本文描述了针对高速运动机构加载试验系统,介绍了不同的加载方式的特点,描述了采用气动加载的原理,误差分析以及最终实现的系统。

    youdao

  • The two slide machine guarantees that the part is always in the centre positioning of loading system is necessary after change-over to a new part.

    滑座机床保证工件模具中心位置,在更换产品时上料系统不再需要重新定位。

    youdao

  • The cyclic loading not only affect the inner part of the material but also the surface state of the corroding surface.

    交变载荷不但影响材料内部同时也影响了腐蚀表面的表面状态

    youdao

  • The sixth part tries to find a way to improve the efficiency of dock loading and unloading system.

    第六探讨提高码头装卸作业线效率途径

    youdao

  • This paper bases on a part of the project of National Natural Science Foundation "Failure criterion of concrete under multiaxial variable-amplitude fatigue loading" (50078010) for study contents.

    本文基于国家自然科学基金项目混凝土多轴变幅疲劳破坏准则》(50078010)中的一部分作为研究内容

    youdao

  • Generally speaking the loading capacity of shear key is mainly governed by embedded part, while quite few test have been taken to the embedded part when the on -going specification is established.

    一般说来剪切承载能力主要预埋件控制,但在制定现行规范对多排多列角钢预埋件的试验研究较少

    youdao

  • The isogram showed that excess phosphorus loading of sediment in the southwest part was higher than that in the northeast part.

    该图显示水果湖及西南沿岸东湖沉积物污染主要区域。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定