• Anchorage zone of pylon, which is a key part of cable-stayed bridge, can pass local concentrated cable force to the tower column safely and uniformly.

    塔·拉索锚固斜拉桥中的关键部位,其作用是局部集中安全,均匀地传递塔柱。

    youdao

  • Prediction of resistance deterioration is an important part of time-dependent reliability analysis of cable-stayed bridge.

    分析斜拉桥结构动态可靠度时,目前抗力衰减预测基本模型经验性都很大,具体结构并不一定适用。

    youdao

  • In cable-stayed Bridges the force and structure in pylon-cable anchorage area are more complex. The area belongs to a key part in a cable-stayed bridge.

    斜拉桥中塔锚固受力结构都比较复杂属于斜拉桥中的关键部位

    youdao

  • So, cable-girder anchorage is the difficult and important part in designing and constructing of Extradosed cable-stayed bridge.

    因此索梁锚固斜拉桥设计施工难点关键

    youdao

  • The cable is one of the key parts of cable-stayed bridge. It takes on most part of the load in constructing and constructed of cable-stayed bridge.

    斜拉斜拉桥重要组成部分承担了斜拉桥施工阶段成桥后正常运营阶段的大部分荷载

    youdao

  • The cable is one of the key parts of cable-stayed bridge. It takes on most part of the load in constructing and constructed of cable-stayed bridge.

    斜拉斜拉桥重要组成部分承担了斜拉桥施工阶段成桥后正常运营阶段的大部分荷载

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定