The parking garden can be sustained by water harvested from the library's roof.
停车花园利用图书馆屋顶收集的雨水可以达到可持续性。
He wrote "NO PARKING" on a small board in the garden facing the road, but it didn't work.
他在花园面向马路的一块小牌子上写了“禁止停车”,但它不管用。
There is an unused parking lot beside the garden where women could learn how to drive, something almost unheard of here — not because it is illegal, just because it is not done.
在花园旁边还有一处未被利用的空地,女人们可以在这学习驾驶。“女人学开车?!”在喀布尔你肯定从没听说过,当然,这不是因为它违法,只是因为还没有这个先例而已。
Q. I’m tired of having my car dented and knocked about on the street and want to use my front garden for parking.
车停在临街,上面有凹痕,还老被撞,这让我很累。
The assembly point for guests and staff during an evacuation will be at the hotel southern garden car parking opposite the hotel main entrance.
酒店疏散期间的客人和员工集合地点为位于酒店南侧花园停车场。
Close the department office and turn off power, water around the public areas before evacuating from the hotel to the hotel southern garden car parking area.
如需全部疏散,其余部门后场人员根据要求关闭部门和公共场所电器设备、门水。疏散至酒店南侧花园停车场集合点。
Hotel Doctor: Go to staff evacuation gathering place (the hotel southern garden car parking area) with the medical box to help any injured person at the fire scene.
医生:携带好医疗箱赶赴员工疏散集合点(酒店南侧花园停车场),做好受伤人员的救护工作。
Two symmetrical pergolas serve as parking and the water cascade exactly in the middle separates the front garden from a courtyard with a Golden Trumpet tree.
两个对称的棚架可以充当停车场,位于中心的小瀑布将庭前花园与种有一株黄金风铃木的庭院隔开。
Garden scale: the park covers an area of 80000 square meters, construction area of nearly 70000 square meters, with ample parking and public space, public facilities provided good.
园区规模:本园区占地面积达80000平方米,建筑面积近70000平方米,拥有充裕的停车位置与公共空间,公用配套设置良好。
In addition, in the Yangtze River Road, Nanshan Road and the intersection of Lilac Garden mechanical parking will also start construction this month.
此外,位于南山路和长江路交叉口处的丁香园机械式立体停车库也将于本月开工建设。
There is no parking at the garden level. Cars are parked in the basement with a car lift.
花园层没有停车场,汽车通过举车器停在地下室。
We changed the parking lot in front of the Cafe into a garden with soil and several kind of trees.
我们将咖啡店前原停车场铺以土壤,种上些许绿植,改造成一处小庭院。
The project starts off with the intention of solving the environmental issue. The first floor plan is designed to make the most of the space left after placing three car parking spots and a garden.
首层的设计是为了最大限度的实现空间的开阔性,剩下的空间布置停车空间和花园。
Our water Permeable Brick (EP Brick) are made by recycled glass and ceramic wastes with high performance of water permeability. It is using for sidewalk, park, garden, plaza, parking lot and so on.
我们的透水砖(EP砖)由再生玻璃和陶瓷废料制成,具有高透水性,可用于人行道、公园、花园、广场、停车场等。
Central garden will be located on the roof top of underground parking lot. It will be composed by central activities space three special courtyards, semi-private garden and three entrances.
中心园林景观位于地下车库顶板之上,主要由中心活动空间及三个特色组团花园、半公共花园空间及三个入口构成。
Central garden will be located on the roof top of underground parking lot. It will be composed by central activities space three special courtyards, semi-private garden and three entrances.
中心园林景观位于地下车库顶板之上,主要由中心活动空间及三个特色组团花园、半公共花园空间及三个入口构成。
应用推荐