But too slow travel speed is directly related to slow drilling displacement and slow evacuation from the explosion site after drilling, which will influence the overall project's schedule.
行走速度太慢,钻孔移位慢,钻孔后撤离爆破现场的动作也慢,影响整个工程的进度。
But too slow travel speed is directly related to slow drilling displacement and slow evacuation from the explosion site after drilling, which will influence the overall project's schedule.
行走速度太慢,钻孔移位慢,钻孔后撤离爆破现场的动作也慢,影响整个工程的进度。
应用推荐