Organize construction management staff and construction materials, construction machinery enter the Site.
组织施工管理人员和材料、施工机械进场;
Then bring upped to request chemical engineering petroleum start construction business enterprise organize construction design.
然后提出了对化工石油施工企业组织结构设计的要求。
With the improvement of operation procedure, organize construction and information system should change accordingly in the future.
同时,针对业务流程改进的深化,提出了未来组织结构和信息系统的配套保障措施。
This paper states relation equipment being used and cost checking in construction, and how to organize construction, save cost, author puts forward effective measure.
本文着重阐述了施工与机械设备的使用与成本核算的关系,对如何合理组织施工,节约成本,该作者采取了行之有效的措施。
Chapter 4. Chemical engineering petroleum construction business enterprise organizes construction present condition analysis and organize construction design request.
第四章化工石油施工企业组织结构现状分析及组织结构设计要求。
Organize construction employees to conduct technical disclosure in order to make them known the construction method and quality requirement. Make good disclosure record.
组织施工人员进行技术交底,使作业人员明确施工的方法和质量要求,并做好交底记录。
Xiamen belongs to the seventh degree anti-seismic zone, construction units should set strict demands on themselves and organize construction meticulously in order to guarantee the project quality.
厦门属七度抗震区,施工单位要严格要求,精心组织施工,确保工程质量。
In the RUP we organize work during the Construction phase by requirements, not by technical issues.
在RUP中,我们在构建阶段根据需求组织工作,不是根据技术问题。
To organize the feasibility study of construction projects;
组织建设项目的可行性研究;
to organize and guide the construction of municipal agriculture science service system;
组织指导本市农业科技服务体系建设;
to compile construction project plans or the service system of the rural township enterprises and organize their implementation, supervision and administration.
编制乡镇企业服务体系建设项目计划,并组织实施和监督管理。
to organize the construction and management of projects in water sector;
组织水务工程的建设与运行管理;
To organize and coordinate the construction of production bases of provisions and edible oil, as well the protection of basic farmland.
组织协调粮油生产基地建设和基本农田保护工作。
To organize and formulate the plan for construction personnel training;to guide the works on continuing education of construction practitioners;
组织制订建设行业人才培养规划,指导建设行业继续教育工作;
to organize the important transportation construction;
组织重点交通工程建设的实施;
Organize the construction site layout planning, including water supply, power supply, processing site, warehouse and office space and other coordination work, solve all the problems of the site.
组织施工现场布置规划,包括供水、供电、加工场地、库房和办公休息区域等协调工作,解决工地一切协调问题。
to organize major international events of forestry and its ecological construction and supervise performance of conventions;
承办林业及其生态建设的重要国际活动和履约工作;
Organize the implementation of the project personnel for construction drawings self-examination, review, construction organization design, construction scheme construction technology solutions.
组织项目实施人员进行施工图纸自审、会审,施工组织设计、施工方案交底技术解答。
Contact and Organize Class Surveyors for on-site inspection according to different construction stage, follow the Inspection Reports and keep contact with the Surveyors.
按照生产建造计划的各阶段,组织联系船级社检验人员到场检验, 并就检验报告进行跟进。
The construction and application of case library, which is a form to organize teaching resources, is also a hotspot.
而案例库作为案例教学资源的一种组织形式,其建设和应用也正成为研究的热点问题。
This article mainly discusses how to reduce the raised dusts, vibration and wave and how to organize the local people to avoid the blasting during the construction process.
本文主要从施工过程中如何减少杨尘、振动,波速以及组织当地群众进行避炮等方面进行了研究和提出了相应对策。
Prepare to establish management, mean is new preparation for establishment application plan, organize, command, coordinate and means whole course to manage project construction of controlling etc.
筹建管理是指新项目的筹建过程中运用计划、组织、指挥、协调和控制等手段管理项目建设的整个过程,使项目成功建立并运营。
This paper mainly introduces construction technology and methods using conventional line construction tools organize and design compact line conductor.
重点介绍了用常规线路施工器具组织设计紧凑型线路导线展放的施工工艺和方法。
Organize Standard Procedure training for different section, improve the construction quality accordingly.
组织并实施各专业工艺流程及作业标准培训,逐步改善施工工艺质量。
The main shaft to load the system construction work was shortened to expect 2. 5 months under well using of space and times organize homework.
充分利用空间和时间组织平行作业,缩短了主井装载系统建设工期2.5个月。
So papers on the drilling safety management system (HSE) is analyzed and studied, discuss the drilling construction of how to organize and ensure safety.
所以论文对钻井作业安全管理体系(HSE)也作了分析研究,讨论钻井作业施工如何组织和保证安全。
Organize and push the corporate culture construction.
组织和推动企业文化建设;
By the end of this tutorial you'll know how to take your concepts and designs and organize them on sheets for presentations and even construction documents.
在本教程结束时,您将知道如何把你的概念和设计,并组织他们对张进行演示,甚至施工文档。
By the end of this tutorial you'll know how to take your concepts and designs and organize them on sheets for presentations and even construction documents.
在本教程结束时,您将知道如何把你的概念和设计,并组织他们对张进行演示,甚至施工文档。
应用推荐