The mixed ore tank is arranged between the sintering ore tanks.
杂矿槽布置在烧结矿槽中间。
Giving a new process of Ventilation and dust control using in the top of blast furnace ore tank.
介绍了高炉矿槽槽上通风除尘的一种新技术,采用移动式通风口加除尘装置,效果良好。
The invention belongs to the technical field of metallurgical iron making, and discloses a combination technical arrangement of two coke and ore tank systems.
本发明属于冶金炼铁技术领域,公开了一种两座焦矿槽系统合并工艺布置。
The construction characteristic of biomembrane oxidizing tank and specialty of packing material used in the process of bacterial heap leaching of uranium ore are introduced in this paper.
报道了赣州铀矿某分矿细菌堆浸工业化应用的概况,并介绍了生物接触氧化槽的结构和吸附尾液氧化再生循环利用的具体措施。
The commonly used dust control methods have their own characteristics and the suitable conditions and they should be adopted according to the operation ways and the structure of ore-tank.
常用的除尘方法各有其特点和适用条件,应根据作业方式及矿槽结构状况有针对性的采用。
The treating method of an ore dressing wastewater is changed to the one using a whirling coagulation sedimentation tank on the basis of the structure of the original ordinary concentrator.
在原普通浓缩机结构的基础上,改为两级串联旋流絮凝沉淀池。
The treating method of an ore dressing wastewater is changed to the one using a whirling coagulation sedimentation tank on the basis of the structure of the original ordinary concentrator.
在原普通浓缩机结构的基础上,改为两级串联旋流絮凝沉淀池。
应用推荐