• The stability of the ore pillar and the roof is a key issue in the pillar recovery in unfilled mined-out area.

    在空区未充填的情况下回采矿柱,矿柱与采空区顶板的稳定性是一个关键问题。

    youdao

  • The stability of the ore pillar and the roof is a key issue in the pillar recovery in unfilled mined - out area.

    在空区末充填的情况下回采矿柱,矿柱与采空区顶板的稳定性是一个关键问题。

    youdao

  • In this thesis, according to the condition of Mujia Hill, the method of roof cutting and ore pillar dilapidation is proposed.

    提出用切顶与矿柱崩落法处理木架山采空区。

    youdao

  • It is proved that the occurrence of roof caving and ore pillar fracturing is rapidly decreased, and the whole safety of mining stop is significantly improved.

    现场实践证明,采场顶板发生冒落、矿柱出现开裂或片帮等现象急剧减少,采场整体稳定性得到显著提高。

    youdao

  • Then, based on the principle of not losing money in mining, the optimal cutting rock height and stoping distance for extracting lying side triangular ore pillar are optimized.

    基于不亏本原则,确定回采下盘三角矿体的最合理切岩高度和后退距离。

    youdao

  • Based on the stress analysis of filling body, it was pointed out that reducing the destructive function of blasting on the filling body is one of the technical keys in ore pillar extraction.

    通过对充填体受力分析,指出减小爆破对充填体的破坏作用是矿柱回采的技术关键之一。

    youdao

  • According to the numerical results and the states of the mining filed, the final mining method of ore-pillar recovery is determined.

    根据数值计算的结果,并结合矿山现场的实际情况,确定矿柱回采试验的最终方案。

    youdao

  • According to the numerical results and the states of the mining filed, the final mining method of ore-pillar recovery is determined.

    根据数值计算的结果,并结合矿山现场的实际情况,确定矿柱回采试验的最终方案。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定