• The stability of the ore pillar and the roof is a key issue in the pillar recovery in unfilled mined-out area.

    未充填情况下回采矿柱,矿柱采空区顶板稳定性一个关键问题

    youdao

  • The stability of the ore pillar and the roof is a key issue in the pillar recovery in unfilled mined - out area.

    末充填情况下回采矿柱,矿柱采空区顶板稳定性一个关键问题

    youdao

  • In this thesis, according to the condition of Mujia Hill, the method of roof cutting and ore pillar dilapidation is proposed.

    提出矿柱崩落处理木架山采空区。

    youdao

  • It is proved that the occurrence of roof caving and ore pillar fracturing is rapidly decreased, and the whole safety of mining stop is significantly improved.

    现场实践证明,采场顶板发生冒落、矿柱出现开裂或片帮等现象急剧减少采场整体稳定性得到显著提高。

    youdao

  • Then, based on the principle of not losing money in mining, the optimal cutting rock height and stoping distance for extracting lying side triangular ore pillar are optimized.

    基于亏本原则,确定回采下盘三角矿体合理高度后退距离

    youdao

  • The paper discusses the new options of short-hole shrinkage: all-over mining, static shrinkage, precipice shrinkage, rock mining conditions, active supporting and ore pillar recovery.

    本文探讨了浅孔留新型变形方案:留矿全面法、静态留矿法、削壁矿法,以及这些方法的矿岩开采条件,采场主动支护,矿柱回收等。

    youdao

  • Based on the stress analysis of filling body, it was pointed out that reducing the destructive function of blasting on the filling body is one of the technical keys in ore pillar extraction.

    通过充填受力分析指出减小爆破对充填体破坏作用矿柱回采技术关键之一

    youdao

  • The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.

    采场顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕,一次性进行回收

    youdao

  • Bolting manual pillar and room method is a good future method of mining Mn ore body of medium thickness and small pitch.

    人工锚杆房一种前途开采缓倾斜锰矿床的采矿方法

    youdao

  • Population and application of the dilution ratio ore drawing method has certain social value and economic value for implementation of the sill pillar-free subdrifting method.

    贫化放推广应用对于实行无底分段崩落的矿山具有一定社会价值经济价值。

    youdao

  • Deficient floor slope Angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.

    采用沿脉布置无底柱分段崩落法,矿体底板倾角不足时,需要下盘岩石开掘进路

    youdao

  • Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.

    采用无底柱分段崩落采矿国内外一直采用截止品位控制出矿。

    youdao

  • According to the numerical results and the states of the mining filed, the final mining method of ore-pillar recovery is determined.

    根据数值计算结果结合矿山现场实际情况,确定矿柱回采试验最终方案

    youdao

  • Disadvantages of sublevel caving without sill pillar lie in high ore loss and dilution as well as difficult control of ore loss and dilution.

    柱分段崩落采矿法存在损失贫化大和损失贫化难以控制缺点

    youdao

  • According to mining condition in Xinli mining area, the room and pillar filling method for large and thick ore-body is determined after research.

    根据新立矿区开采技术条件,研究确定矿体采用分矿房矿柱分层充填开采。

    youdao

  • According to mining condition in Xinli mining area, the room and pillar filling method for large and thick ore-body is determined after research.

    根据新立矿区开采技术条件,研究确定矿体采用分矿房矿柱分层充填开采。

    youdao