• The ore dilution rate depends on the ore drawing parameters.

    矿石贫化取决于参数

    youdao

  • The vibrating ore drawing technique is being popularized presently in many mines in our country.

    振动技术正在我国许多矿山推广

    youdao

  • Applying this new technique to ore drawing, it is both safe and favorable to raise index of ore drawing.

    技术用于采场落安全有利于提高采场落矿指标,对类似矿山有实际参考价值。

    youdao

  • Based on the technical and economical index, an optimal decision for the cutoff grade of ore drawing is presented.

    获取矿石技术经济指标基础上,截止放矿品位进行了优选政策。

    youdao

  • Air leak and dust pollution in ore drawing through long pass in underground mine threaten the underground prodution safety.

    地下开采矿山高溜井卸过程中的漏风粉尘污染威胁矿山井下安全生产

    youdao

  • Taking Jingtieshan Mine as an example, the peper deals with several problems with applying non-dilution ore drawing mw thod.

    镜铁山研究了无贫化放矿方式矿山应用的若干问题

    youdao

  • Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.

    采用无底柱分段崩落采矿国内外一直采用截止品位控制出矿。

    youdao

  • This paper discusses the law of the ore drawing about Sublevel Caving Mining, and analyzes the reasons for the dilution and loss.

    探讨了无底柱分段崩落法放规律分析了造成损失贫化原因

    youdao

  • There are two kinds of hindrances to cohesive ores during ore drawing. One of them is stable stick arch and the other rathole flow.

    溜放粘结料时常出现放矿障碍,一类稳定粘结卡堵,一类是形成管流动

    youdao

  • To block stoping, mining system design mainly includes design of block parameter, design of pillar's dimension, design of ore drawing sequence.

    对于阶段空场法,采矿系统设计主要包括采场结构参数矿柱大小、回采顺序等。

    youdao

  • Scraper is widely used in pillarless sublevel caving due to its high ore drawing efficiency, mobility, flexibility and general purpose application.

    无底柱分段崩落采矿法中,铲运机由于具有效率高、机动灵活、多用性等优点而广泛采用

    youdao

  • As for ore drawn by hand or rock loader, the ore drawing quantity of each chute shall be kept uniform to ensure the flatness of working face of stope.

    人工机出矿方式,出矿穿必须均匀出矿,保证采场工作面平整

    youdao

  • Research on continuous ore drawing and haulage equipment for underground metal mines has widely been done in main foreign countries with mining industry.

    国外主要矿业国家地下金属矿山连续设备进行了深入的研究

    youdao

  • Continuous mining for ore drawing and hauling in stope is one of the important achievements in the research area of continuous mining technology in China.

    采场出矿运矿连续作业,近年来我国在连续工艺技术研究领域取得重大成果之一

    youdao

  • The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.

    采场顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕,一次性进行回收

    youdao

  • Research shows that main cause of ore dilution in sublevel caving mining is tlnrational cut-off grade drawing. Non-dilution ore drawing is most ideal drawing mede.

    研究表明造成无底柱分段崩落法来出矿石贫比大的根本原因在于采用了不合理的截止品位放矿方式,无贫化放矿无底柱分段崩落最为理想的放矿方式。

    youdao

  • Population and application of the dilution ratio ore drawing method has certain social value and economic value for implementation of the sill pillar-free subdrifting method.

    贫化放推广应用对于实行无底分段崩落的矿山具有一定社会价值经济价值。

    youdao

  • YZZ vibration flow aiding machine is a newly developed ore drawing device, which is devised on the basis of the theory of autogenuous synchronization and directional vibro excitation.

    采用自同步定向理论设计,将重力自溜振动出矿融为一体YZZ型振动具有分节组合、大倾角、无侧板的结构特点。

    youdao

  • The characteristics and fundamentals of ore drawing control in block caving method are described and computer-based production scheduling for this mining method is studied in the paper.

    本文阐述了自然崩落特点及其放矿管理基本原理,探讨应用计算机进行自然崩落法的基本方法。

    youdao

  • After analyzing the movement law of ore drawing body, the basic parameters of sublevel mine in a gold mine are calculated by the experiment result of single model and surface model in a lab.

    介绍了无底柱分段崩落基本原理,利用室内单体模型和平模型放矿试验分析了放矿体的流动规律,并据此确定了某金矿无底柱分段崩落法的基本结构参数

    youdao

  • But the reasonable installation position of the vibrating ex - citer in a vibrating ore drawing machine has not yet been determined satisfactorily, which usually affects the drawing efficiency.

    然而振动合理位置确定尚未圆满解决往往因此影响效果

    youdao

  • The main technical performance data of the transfer station of vibrating ore drawing under research, its structural characteristics and the performances achieved in its industrial test are discussed.

    研究振动转载主要技术性能参数、转载站结构特点工业试验取得指标进行了论述。

    youdao

  • It can solve ore-drawing problems with various boundary conditions.

    可以解决各种边界条件下放矿问题

    youdao

  • The process of ore- drawing in block caving is completed under overburden.

    自然崩落法放基本上都覆盖岩层进行的。

    youdao

  • It is concluded that location of foot-wall drawing points are closely related to orebody dip, cut-off grade and ore grade of wall rock.

    认为下盘放矿点位置矿体倾角、放截止品位、围岩含矿品位有着密切关系。

    youdao

  • The practice shows that the flow velocity of bulk ore rock at the stope drawpoint and the dimensions of drawpoint have remarkable influence on the drawing effect.

    实践证明采场放出口矿岩散体速度分布放出口尺寸放矿结果显著影响

    youdao

  • The stochastic medium theory of ore-drawing can properly reflect the movements of ore and rock masses for caving system.

    随机介质理论可以很好地反映崩落法放矿岩移动规律。

    youdao

  • The system is suitable for ore-drawing management of high level and large drawing area of block caving system.

    系统适合大规模阶段块崩落法放矿生产管理

    youdao

  • According to this cutoff grade, the paper has calculated the ratio of ore and rock while cutoff drawing that provide science foundation for the drawing of Xiaoguanzhuang iron mine.

    据此计算截止矿岩官庄矿放矿提供了科学依据。

    youdao

  • It shows that the contact face between ore and waste as a ideal interface is incorrect during drawing.

    研究指出:在放过程中,将崩落矿岩接触视为理想界面不正确的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定