• How to implement the simulation tests for the construction of complex structure in virtual environment so as to obtain optimized construction scheme and to train builders are presented in this paper.

    本文研究了如何虚拟环境实现复杂建筑施工仿真试验获取优化的施工方案施工人员进行培训

    youdao

  • Based on analysis on the two aspects as construction sequence and proper distance, the practical construction scheme is optimized.

    施工顺序合理间距方面进行数值分析,从而使得实际隧道施工方案得到优化。

    youdao

  • The optimized design scheme enables this project to obtain maximum economic benefits with minimize construction investment and operation cost.

    优化设计方案使项目采用最少基建投资操作费用取得最大经济效益

    youdao

  • The construction scheme is optimized by comparison between six calculation results, which provides theoretical basis for the owner making appropriate decision.

    通过比较六种施工方案计算结果进行了方案优化,业主确定合理的施工方案提供理论依据

    youdao

  • The feasible construction period, reasonable construction scheduling and optimized construction intensity are obtained to optimize the construction scheme.

    施工方案进行了综合优化分析,有效提高了施工方案的可靠性合理性

    youdao

  • Traditional stroke input method will be optimized in the coding scheme, word thesaurus construction, etc. Then, the user can use stroke to achieve fast text input on the phone.

    主要对传统笔画输入法编码方案字词构造方而进行优化,使得用户能够运用笔画方式在于机上实现快速文字输入

    youdao

  • Traditional stroke input method will be optimized in the coding scheme, word thesaurus construction, etc. Then, the user can use stroke to achieve fast text input on the phone.

    主要对传统笔画输入法编码方案字词构造方而进行优化,使得用户能够运用笔画方式在于机上实现快速文字输入

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定