If the network does not activate automatically, wait until the system is completely operational, shut it down (go to system and choose shut down), and then reboot.
如果网络不能自动激活,等待直至系统完全运转,将其关闭(转到System然后选择Shut Down),然后重新引导。
At the onset of the earthquake, the plant automatically shut down the fission process, which normally would leave the coolant system — both the main one and a backup generator — still operational.
地震发生时,核电站已经自动中止裂变反应过程,一般只剩下冷却系统——主发电机和备用发电机——仍处于运行状态。
At the onset of the earthquake, the plant automatically shut down the fission process, which normally would leave the coolant system — both the main one and a backup generator — still operational.
地震发生时,核电站已经自动中止裂变反应过程,一般只剩下冷却系统——主发电机和备用发电机——仍处于运行状态。
应用推荐