The construction process follows the same logic and is done manually, accepting the imperfections and the specific circumstances of an open work that enriches the gap between project and construction.
施工的过程遵循了相同的逻辑,而且它是纯手工制作的,建筑接受开放式作业中的不完美和一些特定的情况,以此来缩小项目和施工之间的差距。
The construction process follows the same logic and is done manually, accepting the imperfections and the specific circumstances of an open work that enriches the gap between project and construction.
施工的过程遵循了相同的逻辑,而且它是纯手工制作的,建筑接受开放式作业中的不完美和一些特定的情况,以此来缩小项目和施工之间的差距。
应用推荐