• Use constructional type of progressive dies, change present one step operation of single die construction for two-step blanking, i. e, first step semi-blanking, second ejecting material.

    结构形式现行简单结构操作两工步操作:第一工步为半冲裁,第二工步为推

    youdao

  • Use constructional type of progressive dies , change present one step operation of single die construction for two-step blanking , i.

    结构形式现行简单结构操作两工步操作:第一工步为半冲裁,第二工步为推料。

    youdao

  • According to the final results of analysis, a reasonable excavation length of inverted arch in one step was put forward and applied to the construction of multi-arch tunnel in loess.

    最后提出了最佳黄土仰一次性开挖长度应用于黄土连隧道施工

    youdao

  • According to the final results of analysis, a reasonable excavation length of inverted arch in one step was put forward and applied to the construction of multi-arch tunnel in loess.

    最后提出了最佳黄土仰一次性开挖长度应用于黄土连隧道施工

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定