If an activity on the critical path is a week late, you can't sit idly and allow the entire project to be a week late.
如果处在关键路径上的某个活动延期了一周,你可不能傻坐着眼看整个项目延期一周。
This 20% of code is on the "critical path" and it is these areas that are worth optimizing for performance.
这20%的代码位于“关键路径”上,正是这些方面值得进行性能优化。
If not, determine the critical path and look for ways to accelerate these activities to get you back on track.
若否,找出关键路径,并寻找到加速执行相关工作的办法以便能让你重回正轨。
This places the "orange" resource on the critical path.
这就在关键路径上放置了一个“桔红色”资源。
It dispenses those environments into an on-premise cloud, and once they are out and running, the appliance is not a part of the critical path for that application.
它将这些环境分配到一个预置云中,并且一旦环境启动并运行,那么该设备将不再成为应用程序的关键部分。
Because we've recognized this trend early, we can redistribute our resources to sharpen our focus on critical-path activities.
因为我们早已经认识到这个趋势,我们可以重新分配资源来加深对于关键路径活动的关注。
You will review each of the activities on the critical path and identify the potential risks that could put your schedule in jeopardy.
你会检查关键路径上的每一格活动,并识别可能破坏进度的风险。
Index design has a critical impact on access path selection.
索引设计对访问路径选择至关重要。
Focus on improving the critical code path.
将精力主要放在关键代码路径的改进上。
EBay is so convinced of the future of mobile phone shopping that on Wednesday it acquired Critical Path Software, a mobile phone app developer, to speed its move into this new arena.
在这里输入译文易趣对移动手机购物的未来充满了信心,易趣为了加快自己在这个领域的步伐周三购入了Critical Path软件公司,这是一件移动手机应用程序开发公司。
By choosing an appropriate monitor function, the density of mesh points near the critical points can be bigger than that near other points on the minimal energy path.
通过在自适应零温度弦方法中选择合适的控制函数,可以使得最小能量路径上的网格点密度在这些临界点附近比较大。
For example, you can clearly see the critical path for tasks people are working on if you filter for in-progress tasks and group by critical.
例如,如果对进行中的任务进行筛选并按“关键任务”进行分组,可以清楚地查看工作人员所处理的任务的关键路径。
In this paper we discuss the distribution of vertices of degree 5 on the longest path and cycle and thus give a characterization of contraction critical 5-connected graph in a certain aspect.
讨论收缩临界5 -连通图最长路和最长圈上5度点的分布情况,刻画收缩临界5 -连通图的结构。
It also includes implementing the project plan, along with careful controls to stay on the "critical path", that is, to ensure the plan is being managed according to the plan.
它也包括执行项目计划,同时要认真管理使其处于“关键途径”上,即确保按计划进行。
In this paper, on the basis of static timing analysis, a new method is employed to enhance the efficiency of FPGA partition by extracting the information of critical path-delay.
文章在静态时序分析的基础上,提出了一种利用关键路径时延信息提高FPGA分割效率的方法。
Then a detailed ASIC design of the SHA-1 algorithm module is given, whose logic on the longest critical path is optimized.
随后给出了SHA - 1算法模块的详细ASIC设计,优化了SHA - 1模块最长关键路径上的逻辑结构。
S method, which was created by Kato Shokichi (Japan), the event on the critical path should be done first.
通常流行的日本加藤昭吉的K·S法,主张关键工序先进行。
The critical points on the minimal energy path, which often denote stable states or transition states, are concerned.
最小能量路径上的临界点往往表示稳定状态或者转化状态,是人们所关心的。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.
论述了图论的技术以及项目管理技术,并且根据图论技术和项目管理技术设计出了关键路径算法以及网络图绘制算法。
First of all, the paper USES work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the work Load Point system.
首先,本文运用工作负荷点系统的评估系统、项目分解结构以及关键路线法构建了基于工作负荷点系统的进度度量监控体系。
On the other hand, the critical path to business success is not the technology itself, but changing the business process and the work supported by the technology.
另一方面,商业成功的关键要素并不是技术本身,而是改变技术所支持的业务流程和工作。
To verify deadlines of activity instances within workflow, a method of dynamic verification was proposed based on the critical path.
为了动态验证工作流中活动实例的截止期限,提出了一种基于关键路径进行动态验证的方法。
However, a critical path can end, as an example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint.
然而,可举例说明,关键路线可以止于处于项目进度表中间,并受到“不迟于完成”类型的强加日期进度约束的某一计划里程碑。
This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.
就时标网络计划在工程中如何确定关键线路、分析工作时间参数、进行网络计划的控制等进行阐述。
Inattention and muddling through may be the path of least resistance, but they should not and must not represent our national policy on this critical issue.
淡漠,敷衍了事可能走阻力最小、但他们并不能代表我们不应该在这个关键问题上的国家政策。
D. Start work on only the critical path activities.
只开始关键路径上的活动。
Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.
由于本系统以网络图的形式进行工程管理,因此提供了一个简单、直观制作网络图的平台。
This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.
由于本系统以网络图的形式进行工程管理,因此提供了一个简单、直观制作网络图的平台。