Taking a top-down approach to solving a business problem might require new tools or a consultancy engagement to focus the business on identifying or prioritizing the business strategy or tactics.
采取从上到下的方法解决一个业务问题可能要求使用一些新工具或引入咨询公司,以将业务专注于确定或对业务策略和战略进行优化级划分。
Design thinking is based on taking a human-centred approach to problem-solving.
设计思考是基于利用以人为中心的方法去解决问题。
The paper presents a new approach, which is called dynamic priority scheduling based on total potential reduction, to solving the multi robot path planning and coordination problem.
本文提出了一种解决多机器人路径规划与协调问题的新方法:基于总体势减小的优先级动态调度策略。
This paper presents a twice planning approach to solving minimum-time trajectory planning problem for robotic manipulators. Pre-planning is performed on the specified path.
本文针对机器人最小时间轨迹规划问题提出了一种二次规划的优化方法。
This paper presents a twice planning approach to solving minimum-time trajectory planning problem for robotic manipulators. Pre-planning is performed on the specified path.
本文针对机器人最小时间轨迹规划问题提出了一种二次规划的优化方法。
应用推荐