• Later on, the on-site concrete durability test of the trestlework in the workshop building is taken as one example to analyze the concrete cover and the dept of its carbonization.

    开展了工业厂房栈桥耐久性现场检测工作,对实测的混凝土保护层厚度碳化深度进行了分析

    youdao

  • Gharib has already been contacted by a civil engineer in Nicaragua, who wants to put up buildings with adobe roofs supported by concrete arches on a site that heavy equipment can't reach.

    尼加拉瓜一位土木工程师已经联系了加利普,这位工程师重型设备无法到达的地方建造混凝土支撑的土坯屋顶

    youdao

  • In order to make the complex affordable, Safdie devised a plan for on-site mass production of the concrete blocks.

    为了使建筑人人买Safdie进行现场大规模生产混凝土制定了一套计划

    youdao

  • The site is prone to flooding so the entire building is constructed on an engineered concrete slab, which raises the house above historic flood levels by using screw-pile footings.

    基地易于洪水因此整个建筑用工程性混凝土建造通过使用螺旋桩基础,让房子升高在历史洪水水位之上

    youdao

  • Most of material is custom made or produced on site. Concrete was produced on site as no cement plant on the island could guarantee concrete density.

    建筑大部分材料定制当地生产的。混凝土现浇的,因为岛上没有一个水泥厂能够保证混凝土的密度

    youdao

  • These wooden dwellings by HGA Architects and Engineers sit atop concrete piers on a sloping site in a Minnesota woodland.

    明尼苏达的林地里,HGA建筑事务所工程所设计的木屋一个倾斜的坡地,用混凝土墩支撑

    youdao

  • Quality inspection tools: All inspection tools to be used on-site should be made ready before concrete pour starts.

    质量检测工具凡现场使用的检测工具,混凝土浇筑做好准备。

    youdao

  • The walls' thickness, underlined by ribbed concrete walls cast on site and cut-out window frames, suggests a heightened and reassuring feeling of protection.

    墙体厚度通过基地的混凝土切断窗户框架凸显暗示高差变化和保护

    youdao

  • From the architect. Constructed with prefabricated steel and concrete modules this 200m2 home is built on a steeply sloping site in an island suburb of Stockholm.

    来自事务所描述。预制钢材水泥模型建成的200平方米别墅,位于斯德哥尔摩的城郊一处斜坡上。

    youdao

  • Finally, for a practical project, an experiment of temperature field of a cubic concrete block is made on construction site and the back analysis for unknown parameters is carried out.

    结合实际工程工程现场进行立方体混凝土温升试验用有限元其某些温度特性参数进行了反演分析

    youdao

  • The piers that anchor the house to the ground and the concrete pads on which the chassis sits are constructed on-site, using local labor and conventional construction techniques.

    用来将建筑锚固地面基础以及用来放置建筑“底盘”的混凝土平板则可以利用当地传统的技术劳动力建造。

    youdao

  • So as to maintain stability, the existing floors composed of cast-iron posts and slab beams were methodically replaced by a new structure composed of mushroom posts and concrete floors poured on site.

    为了保证稳定性铸铁构件厚板梁组成原有楼层一种新的结构取代,这种新的结构由新型连接构件和现混凝土楼板组成

    youdao

  • Before concrete vibration starts, plan well number of sets of sample blocks to be retained and check whether on-site form testing is enough.

    混凝土振捣做好留置计划检查现场是否

    youdao

  • This article gives the construction procedure and instructions for on-site casting of continuous concrete box beam with mobile mould.

    介绍移动模架施工混凝土连续箱梁施工工艺以及施工中应该注意的事项

    youdao

  • The concrete supports constructed in situ. The two large post-tensioned girders and also concreted on site.

    具体支持建于原位两个后张梁,并现场浇注混凝土

    youdao

  • In the present study, the concrete method and steps are recommended for adopting statistical analysis of Regional Variety Test on multiple years and sites basis after year and site weighted values.

    本文提出采用地点权数年份权数多年多点品种区域试验产量结果统计分析具体步骤方法

    youdao

  • The whole building is raised above its site on fins of concrete, featuring arched, triangular and rectangular cutouts that allow visitors to use the area as a covered walkway.

    整个建筑混凝土的两翼托举到地面以上。混凝土结构设有拱形三角形矩形的开孔,允许参观者这些区域作为走廊。

    youdao

  • The concrete base of the library is cast on a bed of large rocks gathered on-site.

    混凝土图书馆大块的岩石为地基

    youdao

  • Placing concrete plug on site to substitute the weak plane is adopted after comparing several treatment schemes.

    多种处理方案比较选用混凝土置换一定范围的地质软弱

    youdao

  • The accuracy of the concrete strength obtained from on site testing is closely associated with the security of structure.

    混凝土强度现场检测结果准确性直接关系到结构安全性

    youdao

  • The site-selecting principles and design methods of field exposure station on coastal reinforced concrete structures are introduced in this paper.

    介绍沿海混凝土结构现场暴露试验站选址原则设计方法,并依此详细介绍某沿海现场暴露试验站的设计。

    youdao

  • Nanjing concrete cutting on the site requirements for the construction of blasting and construction personnel and strict regulatory requirements.

    南京混凝土切割要求现场切割爆破施工人员以及监管人员严格要求。

    youdao

  • Pile foundation is widely used in construction in Shanghai region, but the site test data on bearing capacity of pre-cast concrete pile based on cohesive soil were lower than theoretical level.

    上海地区建筑工程普遍采用桩基粘性为持力层预制实测承载力普遍低于理论值,主要是因为休止期较短及对端承力作用认识不足。

    youdao

  • This paper also gives the method of spreading steel fiber by layering on site, which can be widely applied in product concrete at present.

    针对广泛应用商品混凝土提出现场分层铺撒纤维的施工方法

    youdao

  • This article proposes several recommendations on how to control the quality of in-site mixed concrete based on the actual conditions in job site.

    本文结合施工现场实际情况,如何控制施工现场自拌混凝土质量几点意见。

    youdao

  • A trial of mixing on-site for testing the stability of concrete production quality is expounded. The method features for simplicity, directness and short periodicity, which can be widely used.

    介绍了一种通过现场检验混凝土生产质量稳定性方法方法具有简单直接周期的特点,可以广泛应用。

    youdao

  • In order to assess the accuracy of this method on site, verification tests are undertaken on a number of concrete structures.

    为了评估这个网站方法准确性确认检验进行混凝土结构数目

    youdao

  • Based on the water chemical analysis on the construction site of Handan City in recent years, an erosion evaluation was made on the concrete. The data was applied and managed systematically.

    根据邯郸市建筑场地近几年化学分析成果,评价地下水对混凝土腐蚀性,并这些资料进行了系统整理、综合利用,建立了城市地下水腐蚀性评价系统。

    youdao

  • Yuji Yokoyama, general manager at Obayashi, one of Japan's five big contractors, says that workers can build a storey in three days with its system, as compared to weeks if pouring concrete on site.

    日本承包商之一大林组(Obayashi)总经理YujiYokoyama表示,借助这个系统员工3天内建成楼,如果现场浇灌混凝土的话需要数周才能完成。

    youdao

  • Paul is a meticulous taskmaster on a job site, and he tends to disapprove of my cutting corners - as I tried to do by reducing the concrete in the foundation.

    工地上,保罗是个谨慎的工头,总是同意减少边角因为减少地基混凝土

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定