• The validity of the fussy optimum design model and the necessity of taking corrosion effect into account are verified by the optimum calculation on Bohai BZ28-1 oil storage platform.

    通过对渤海BZ 28 - 1油田储油平台的优化计算,验证了该模型的有效性及考虑腐蚀影响的必要性。

    youdao

  • The validity of the fussy optimum design model and the necessity of taking corrosion effect into account are verified by the optimum calculation on Bohai BZ28-1 oil storage platform.

    通过对渤海BZ 28 - 1油田储油平台的优化计算,验证了该模型的有效性及考虑腐蚀影响的必要性。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定