It is shown that the design and construction of nuclear power plants arc successful, the quality of the equipments is fine and the operation of the plants is efficient.
这说明我国核电站的设计、建造是成功的,设备的质量是好的,运行水平是高的。
Before now the research on seismic safety of nuclear power generating stations focused into principal structures and was behind in equipments.
以往有关核电站抗震安全性的研究主要集中在主体工程上,而对其中辅助设备的研究比较薄弱。
The nuclear reactor coolant pump (RCP) is one of the core equipments in PWR nuclear Power Plant.
核主泵是压水型反应堆核电站中的核心设备之一。
Abstract :The Full Scope Simulator realizes the functional simulation of various systems and equipments in the Nuclear Power Plant.
摘要 :全范围模拟机实现了对电厂系统和设备的功能模拟。
Closer to you, we have also supplied equipments and transferred technology which has been put into use by Chinese engineers to build nuclear power reactors in qinshan.
在更靠近苏州的地方,秦山核电站,我们为中国的工程师们自建核反应堆提供了设备并转移了技术。
The monitor equipments for detecting nuclear noises generated by nuclear power facilities are crucial for safety of running such facilities.
监测核设备噪声的仪器对核设备的安全运行是十分关键的。
As one of the key components of the nuclear equipments, the complicated large power head is difficult to be forged and machined successfully.
大型核电封头,作为核电设备关键部件之一,形状复杂,锻造、加工难度大。
Making the suitable stipulation to the quality and reliability of the nuclear class equipments, is the foundation of guarantee to realize "the goal of the overall security" of the nuclear power plant.
对核级设备的质量和可靠性做出适宜的规定,是保证实现核电厂“总体安全目标”的基础。
This paper describes duties, design criteria and major equipments of exhaust air cleaning for PWR nuclear power plants.
本文介绍了压水堆核电站排风净化的任务、设计准则和主要设备。
The maintenance tactics, the maintenance cycles and their difference for IE and NIE equipments in nuclear power station are studied.
研究了核电站核岛内外设备的不同维修策略、维修周期。
The Invitation for Bid for Xianning Nuclear Power Plant equipments (Crawler Crane) is scheduled to commence; Xianning Nuclear Power Plant was approved by the authorities of P. R.
中广核工程有限公司作为咸宁核电工程的建设管理者,现就该工程的桁架臂履带式起重机进行招标采购。
The Invitation for Bid for Xianning Nuclear Power Plant equipments (Crawler Crane) is scheduled to commence; Xianning Nuclear Power Plant was approved by the authorities of P. R.
中广核工程有限公司作为咸宁核电工程的建设管理者,现就该工程的桁架臂履带式起重机进行招标采购。
应用推荐