NPP has been undergoing compatibility tests with sensor engineering development units or actual flight units and with the ground system.
NPP已经进行了工程开发的传感器或实际飞行装置同地面系统的兼容性测试。
NPP is a risk reduction mission for NPOESS, and will be the first major element of the next generation U.S. Earth observation system when it is launched in 2010.
NPP是NPOESS的风险降低任务,将成为2010年发射的下一代美国地球观测系统的首个主要组成部分。
Fault tree expert system (FTES) is GUI software based on the local database, which is developed to aid the FT-building work of fluid systems in NPP.
故障树辅助建树专家系统(FTES)是基于本地机数据库的图形界面软件,其目标是辅助建造核电站流体系统故障树模型。
The study of the net primary productivity (NPP) will contribute to the study of the carbon cycle and the carbon dynamic changes. Its sensitivity has a great influence on the global climate system.
植被净第一性生产力(NPP)的研究有助于碳循环和碳动态的研究,其敏感性对全球气候系统有着重要的影响。
The natural circulation ability of PWR (pressurized water reactor) coolant system is one of inherent safeties of this kind NPP (nuclear power plant).
压水堆核电厂反应堆冷却剂系统自然循环能力是这种类型核电厂固有的安全性之一。
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。
The setup of Daya Bay NPP training system with an emphasis on Daya Bay NPP's authorization training system as well as operational personnel training system is reviewed.
全面回顾了大亚湾核电站培训体系的建立过程,重点阐述了具有大亚湾核电站自身特色的授权培训制度和运行人员培训体系。
In order to improve the safety arid reliability of nuclear power plant operation, many tech-modifications related to system or equipment have been completed since operation in Qinshan NPP.
为了提高核电站运行的安全性和可靠性,秦山核电厂自运行以来对系统设备进行了多项技术改造。
On the basis of this work above, the agile supply management, implementation of concurrent engineering and design of integrated managing system for NPP is researched.
在此基础上,对核电厂敏捷供需链、并行工程方法的实施以及集成管理系统的设计进行了研究。
This paper simply presents the commissioning of moisture separator reheater (MSR) system and its monitored control system (RTC_5) of Qinshan NPP 300mw turbine generator.
本文简要地介绍了秦山核电厂300MW汽轮发电机组汽水分离再热器(MSR)系统及其监控(再热温度控制器——rtc_5)系统的调试、投运等。
This paper analyzes models of measuring system, control and protection system, system equipments, equipment failure, and some auxiliary system in CHASHIMA NPP.
分析了CHASHIMA核电站的测量系统、控制与保护模型、系统设备及设备失效模型、辅助系统管网模型。
The initial core loading program, nuclear safety and nuclear monitoring during the core loading and temporary instrumentation system for Qinshan NPP is described.
本文介绍秦山核电厂首次装料程序、装料中的核安全与核监测,以及装料试验用的临时核测仪表和设备。
If power system fault were removed quickly enough, the interaction effects between power system and NPP are insignificant.
若电网故障切除迅速,核电厂与电力系统之间的相互影响很小。
If power system fault were removed quickly enough, the interaction effects between power system and NPP are insignificant.
若电网故障切除迅速,核电厂与电力系统之间的相互影响很小。