Using this option improves the performance of scans of the NPI by facilitating parallelism.
通过使用这个选项,可以促进并行性,从而提高NPI的扫描性能。
If your NPI is likely to grow significantly, then choose a relatively larger value.
如果NPI极有可能显著增长,那么应选择一个更大的值。
Placing the pieces on separate I/O paths reduces the contention of SQL operations that need to access the NPI.
将这些块放在不同的I/O路径中,可以减少访问NPI 所需的SQL操作的争用。
The researchers describe their study as the largest ever of its type and say students' NPI scores have risen steadily since the current test was introduced in 1982.
研究人员称此项研究为迄今为止同类研究中规模最大的一次。从1982年“自恋人格调查”测试引进以来,接受测试学生的NPI得分一直是稳步升高。
An example would be the optimization of the New product Introduction (NPI) business process by applying MDM for the product master data domain.
例如,通过对产品主数据领域应用MDM,优化newProductIntroduction (NPI)业务过程。
Setup schedule for all manufacturing preparation task and submit it to NPI project leader in time at project beginning.
在项目开始的时候设定与制造准备相关任务的计划时间表,提交给新产品导入领导人。
Cell leader should help out NPI Engineer on operator training on-line.
线长应该协助新产品工程师进行操作工在线培训。
With necessary help and instruction can manage the implementation of NPI project.
在必要的支持和协助下能完成新项目导入工作。
Submit weekly report to NPI Project Leader & NPD planner before local weekly meeting on time during production preparation period, attend weekly meeting to discuss present status.
在准备阶段,需要在每个本地周会前按时向新产品领导人和计划员提交进展周报,参与周会时讨论现在的状态。
Setup schedule for all purchasing items and submit it to NPI project leader in time at project beginning. This schedule should include measurable goal — delivery plan.
在项目开始前为所有采购事宜设定计划时间表,递交报告给新产品领导人。这个计划时间表应当包括可衡量的目标—交货计划。
Work closely with manufacture process and NPI engineer to architect, define and deliver optical characterization equipment and various test and calibration fixtures.
密切关注制造工艺和新产品工程师,以便架构,界定和传输光学特性设备和各项测试及校准装置。
Contact supplier on any parts quality issue during NPI period, push them to solve problem.
在新产品导入期间对于任何部品质量问题联系供应商,推动供应商解决问题。
Negatively pressurized irrigation (NPI) method, a newly irrigation technology, in which the elevation of the emitters is higher than that of the water source, runs under negative hydraulic head.
负压灌溉法是一种新近提出的节水灌溉技术,灌溉时供水水头为“负值”,即灌溉水源高程低于灌水器高程。
Setup schedule for all sourcing items and submit it to NPI Project leader in time at project beginning.
在项目开始前为所有部品认证/本地化事宜设定计划时间表,递交报告给新产品领导人。
Cell leader should assist NPI Engineer on operator training on-line.
线长应该协助新产品工程师进行操作工在线培训。
NPI Project Leader will hold Project Kick-off Meeting to initiate the execution of Project.
新产品导入项目领导人将召开发动会议,发动项目。
After ramp up, NPI project leader will submit project closure report for review with cross function department, then close whole NPI project after approval.
在爬坡量产后,项目团队领导人提交项目结束报告给各职能部门进行审核,在批准后正式关闭整个新产品导入项目。
Review ECO which is submitted for review, with NPI Engineer or MOM Manufacturing Engineer, and then submit it for approval.
和新产品导入工程师或生产部制造工程师一起审核已经递交审核的ECO,然后将其递交批准。
MOM should assign Production ME to join in NPI team before pilot run at least.
制造部经理应该至少在试生产前分配制造部制造工程师加入新产品导入团队。
NPI Project Leader will hold Project Kick-off Meeting to initiate the execution of Project.
新产品导入项目领导人将召开启动会议,启动项目。
Release all parts to cell in time according NPD schedule and NPI Project leader's instruction.
根据新产品的生产计划和新产品项目领导人的指示及时发放物料到生产线。
NPI project Leader will collect and review plans for sub-task from project Team members from cross functional department, then create schedule for NPI project.
新产品导入项目领导人将收集和汇总各个职能部门的计划,来形成新产品导入计划。
Assist own NPI coordinator to achieve NPI sub-task on schedule.
帮助本部门的新产品协调人按照计划完成项目中赋予的任务。
During this ramp up period, whole NPI team will work together on output target and quality target.
在爬坡量产期间,整个项目团队将一起达成产量目标和质量目标。
Implement solution during NPI period and mass production.
在新产品导入期间和大规模生产期间执行解决方案。
Setup schedule for all purchasing items and submit it to NPI project leader in time at project beginning. This schedule should include measurable goal delivery plan.
在项目开始前为所有采购事宜设定计划时间表,递交报告给新产品领导人。这个计划时间表应该包括可衡量的目的—交货计划。
Take over product from NPI period to mass production period smoothly.
在量产后从新产品导入部门顺利地接收产品。
The theory analysis and experiment result prove that the nPI can improve control system characteristics obviously.
理论分析和应用结果表明,它能显著改善控制系统的静态和动态性能。
Reliable NPI process is critical to the success of new product projects.
可靠的新产品导入流程是新产品项目取得成功的关键。
A kind of nonlinear controller nPI is presented and used to correct scanning mirror precise servo system in this paper.
本文给出一种非线性控制器,并将它应用于扫描镜精密伺服系统的校正。
应用推荐