Give cost and time data for project tasks, the Six Sigma Black Belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule.
给出项目任务的成本和时间数据,六西格玛黑带应能计算出正常的和紧急加快的生产费用表以及最小的生产总费用表。
There is a precedence relationship between tasks. Each task has its own normal working time and crashed working time. Each task has its own cost per day of working faster.
工序与工序之间存在着一定的前后关系,每个工序有着自己的正常加工时间和通过赶工所能达到的最短加工时间以及每赶工一天的赶工费用。
After the conveying roll is damaged, the maintenance and dismantling time is short, thereby the normal use of a customer can be ensured, and the maintenance cost of the customer can be reduced.
输送辊被损坏后,维修拆卸时间较短,可以保证客户的正常使用,减少了客户的维修成本。
After the conveying roll is damaged, the maintenance and dismantling time is short, thereby the normal use of a customer can be ensured, and the maintenance cost of the customer can be reduced.
输送辊被损坏后,维修拆卸时间较短,可以保证客户的正常使用,减少了客户的维修成本。
应用推荐