This scenario is typical in the case of an executive who employs an administrative assistant to schedule meetings and appointments and to respond to non-confidential email messages.
这种场景在下列情况下很典型:雇佣行政助理的高级管理人员安排会议和约定的情况下,以及他响应非机密电子邮件消息的情况下。
This allowed the iteration deliveries to be shipped on schedule, but required careful management of the non stop-ship scenario backlog.
这令迭代交付按计划完成,但需要对非停船场景后备的小心管理。
The HTTP/CLI API provides a convenient way to start or schedule the execution of one or more data rules from a non-IBM environment.
HTTP/CLIAPI提供一个很便利的方法,从非 IBM 环境启动或调度一个或多个数据规则执行。
This action launches and runs the schedule and then launches the non-editable SIP Performance Report for these tests.
该操作启动并运行计划,随后为这些测试启动不可编辑的SIPPerformanceReport 。
Use this method for monitoring J2EE, non-J2EE, and Web service applications that do not have automated application monitoring, which is the situation with a performance test or schedule.
使用这个方法可以监控那些没有进行自动化监控的J2EE、非j2ee和Webservice应用程序,这可以适用于性能测试或者调度的情况。
Hospitals in 1976 were encouraging their "customers" (patients) to schedule non-urgent surgery in order to avoid overuse or underuse of hospital facilities.
1976年,医院鼓励“顾客”(病人)采用非急诊手术以避免医院设备的过度使用和使用不足。
Arrange the routine and non-routine task during line maintenance and schedule maintenance.
负责航线和定检的例行和非例行维修任务分配和协调工作;
Three non-conference strengths of schedule, Adam, in terms of the rank. They've already won 25 games.
论排名,非联盟赛的时间表强度是第三。他们已经赢了25场比赛。
Results It was found that the rate of recipients with non- compliance was 28.3%. They are characterized with changing the drug dose or schedule and putting off checking-up.
结果28.3%的患者没有完全依从治疗计划,主要表现为没有定时、定量服药及没有及时复诊。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
If the Contract does not include a schedule of payments, the Contractor shall submit non-binding estimates of the payments which he expects to become due during each quarterly period.
如果在合同中没有支付表,则每个季度承包商应就其到期应得的款额向雇主提交一份不具约束力的估价单。
By calculating and analyzing the non-linear relationship between the status of cars with automatic transmission and the optimum shift based on neural-network, the shift schedule model can be obtained.
通过对电控自动变速器汽车的状态与最佳档位之间的非线性关系进行基于神经网络的计算和分析,得出换档规律模型。
Objective To compare the efficacy and side effects between 3-week and 4-week schedule of gemcitabine plus cisplatin for advanced non-small cell lung cancer.
目的比较健择联合顺铂治疗晚期非小细胞肺癌3周和4周方案的疗效和不良反应。
Objective To compare the efficacy and side effects between 3-week and 4-week schedule of gemcitabine plus cisplatin for advanced non-small cell lung cancer.
目的比较健择联合顺铂治疗晚期非小细胞肺癌3周和4周方案的疗效和不良反应。
应用推荐