Or, you can create a simple scheduling front end that is integrated in a non-IBM environment.
或者,您可以创建一个简单的、集成到非ibm环境的调度前端。
Work Management - plan, cost, budget, resources and scheduling of project and non-project work.
工作管理(Work Management)——计划、成本、预算、资源、项目时间安排以及非项目的工作。
In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。
The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).
考虑并行批加工机上不同尺寸工件的调度问题;目标是极小化最大完工时间。
Generally speaking, the non-volume-related activities consist of many supporting activities such as materials handling, set-ups, production scheduling, buying or selling order filling, and etc.
一般说来,与数量不相关的作业包括像材料处理、生产准备、生产计划、购销定单的填制等支持性作业。
Once the non-functional requirements are identified, scheduling and resource requirements need to take care of these as well.
一旦非功能性需求确定下来,就需要注意进度和资源需求。
Vehicle scheduling problem with non full load is a fundamental problem of vehicle scheduling problem. Because it is a typical NP hard problem, traditional algorithms usually are not satisfied.
非满载车辆调度问题是车辆调度问题中的一个基本问题,由于它是一个典型的NP难题,传统方法的求解结果往往不能令人满意。
Non-electrical quantity detecting system is a new auto-control system that adapt automation of electric scheduling, self-service and integrating automatism in substation.
主变非电量测控系统是适应电力调度自动化、变电站实现无人值班化和综合自动化的一种新型自动测控系统。
Considering the generators bidding prices curves, the generation scheduling error optimization problem is high dimensional, disperse, complex constrained, non-liner problem.
当考虑到发电机报价曲线的影响时,发电计划偏差优化问题是一个高维、离散、约束条件复杂的非线性最优化问题。
This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.
采用网络理论构造了平行流水作业的非连接图模型,提出了采用蚁群算法求解平行流水作业计划问题,以及求解过程中可行路径表的建立方法。
This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.
采用网络理论构造了平行流水作业的非连接图模型,提出了采用蚁群算法求解平行流水作业计划问题,以及求解过程中可行路径表的建立方法。
应用推荐