This paper discusses non optimum analysis theory of system and points out main problem of exploring indefinite system optimization.
对系统非优分析理论做了较为详细的论述。
Based on minimizing the system gross cost, optimum task lot and transfer lot sizes of bottleneck and non-bottleneck resources are determined.
以系统总成本最小化为目标,确定了系统中瓶颈与非瓶颈资源上的加工批量与运输批量。
Based on minimizing the system gross cost, optimum task lot and transfer lot sizes of bottleneck and non-bottleneck resources are determined.
以系统总成本最小化为目标,确定了系统中瓶颈与非瓶颈资源上的加工批量与运输批量。
应用推荐